Back to Mavenlink.com Blog Tour Status

Insights Update [December 2021]

INFO

On December 9, 2021, we updated Insights standard dashboards, metrics, attributes, and facts. This article provides a summary of the changes.

Overview

The Mavenlink Insights platform gives you visibility into all your data so you can make informed and timely decisions. Insights comes with a set of standard dashboards, plus the ability to create custom reports for any data you need.

To enhance our standard dashboards, we've added homepage tabs to help you understand how to leverage these powerful reports for your business. We've also updated the names and descriptions of metrics, attributes, and facts to simplify and speed up custom report building—giving you the clarity and confidence to create your own Insights reports.

Home Tabs for Standard Dashboards

Each standard dashboard now includes a Home tab that describes the reports in each tab and explains the key concepts and calculations used throughout the dashboard. These homepages help you find reports that contain business-critical information and quickly jump to the tabs you use most often.

The Home tab in the Utilization dashboard

Updated Metrics, Attributes, and Facts

The names of metrics, attributes, and facts have been updated to make it easier to find the items you need when building custom reports. Names now use the Category: Name format to clarify what each metric, attribute, and fact is for and to differentiate similarly named items. For example, the two attributes previously named "Approved" are now "Expense: Approved" and "Time Entry: Approved." This also groups related items near one another, so you can quickly add relevant data to your custom reports.

We’ve also updated descriptions to better explain how metrics are calculated, how attributes group data, and where facts pull data from. These new descriptions help you choose the right metrics, attributes, and facts to display the data you need in the way you want.

The metrics list in the report editor

The new names and descriptions will appear in the following areas:

Note: If you've set a custom name for a metric or attribute in a report, the custom name will continue to appear in the report and in data exports.

INFO

Some attribute and fact names are now prefixed with a subscript character ( ͺ ) to indicate that they are supplemental. Supplemental attributes and facts may be used with beta features, are infrequently used, or are nonfunctional. Supplemental attributes and facts now appear at the bottom of their respective lists, making key attributes and facts more accessible.

Metrics

In addition to the name and description update, we also streamlined the out-of-the-box metrics to just over 200 metrics. Now, when you create custom reports, you'll see only the most essential and frequently-used metrics.

The ~700 surplus metrics have been moved into our supplemental set of metrics and will no longer be available when creating new custom reports. If you want to use a supplemental metric in a new custom report, you can duplicate the supplemental metric to convert it to a custom metric. If you have any questions about how to use supplemental metrics, please reach out to your Business Intelligence Consultant or Client Success Manager.

The update will not disrupt the functionality of standard and custom reports that use supplemental metrics—reports containing supplemental metrics will continue to load.

The following table lists the renamed metrics. Supplemental metrics are at the bottom and are prefixed with a subscript character.

Old Name New Name Folder
Availability % All (Allocations), without pf Availability: Allocated %, All Resources Workday and Capacity
Availability: % (Named Resource Allocations) Availability: Allocated %, Named Resources Workday and Capacity
Allocated Hours: Available Hours Availability: Allocated Hours Workday and Capacity
Availability: Hours (All Workspace Allocations) Availability: Allocated Hours, All Resources Workday and Capacity
Availability: Hours (Allocations, Hard Only) Availability: Allocated Hours, Hard Allocations Only Workday and Capacity
 
Availability: Hours (Named Resource Allocations) Availability: Allocated Hours, Named Resources Only Workday and Capacity
Availability % Availability: Scheduled % Workday and Capacity
Availability: Hours Availability: Scheduled Hours Workday and Capacity
Allocated Bill Rate Bill Rate: Allocations Rates
Effective Bill Rate: Billable Hours Only Bill Rate: Time Entries, Billable Rates
Effective Bill Rate: All Hours Bill Rate: Time Entries, Non-Billable & Billable Rates
Cost, Actual [sum] Cost Actual Cost
Cost (All) + Non-Billable Expenses Cost Actual + Expenses: Non-Billable Cost
Cost, Actual: Non-Billable Time Cost Actual: Non-Billable Cost
Cost, Allocated: All - (RAD) Cost Allocated Cost
Cost EAC: via Actuals + Allocated (Factors Completed or Open) Cost EAC: Allocated + Non-Billable Expenses Cost
Cost EAC: via Actuals + Sched (Factors Completed or Open) x-Expenses Cost EAC: Scheduled Cost
Cost EAC: via Actuals + Scheduled (Only Tasks Not Completed) Cost EAC: Scheduled + Non-Billable Expenses Cost
Cost, Allocated Projected: From Today (RAD) Cost ETC: Allocated Cost
Cost, Projected: From Today (Only Tasks Not Completed) Cost ETC: Scheduled Cost
Cost, Projected [sum] Cost Scheduled Cost
Cost, Projected: Billable Tasks Cost Scheduled: Billable Margin and Cost
Cost, Actual: Billable Cost, Actual: Billable Cost
Date: Earliest Task Start Date (MM/DD/YY) Date: Earliest Task Start Date (MM/DD/YY) Dates
Date: Latest Task Due Date (MM/DD/YY) Date: Latest Task Due Date (MM/DD/YY) Dates
Date Metric - Project Due Date Date: Project Due Date (MM/DD/YY) Dates
Date Metric - Project Start Date Date: Project Start Date (MM/DD/YY) Dates
Dynamic Input: [Detect Boolean A] Dynamic Input: [Detect Boolean A] Dates
Dynamic Input: [Detect Boolean B] Dynamic Input: [Detect Boolean B] Dates
_Global Date [max] Dynamic Input: Date [Max] Dynamic Inputs
_Global Date [min] Dynamic Input: Date [Min] Dynamic Inputs
Expenses Charged: All Expenses Expenses
Expenses Charged: All Approved Expenses: Approved Expenses
Expenses Charged: Fixed Fee Tasks Expenses: Billable, Fixed Fee Expenses
Expenses Charged: Billable T&M Expenses: Billable, T&M Expenses
Expenses Charged: Invoiced Expenses: Invoiced Expenses
Expenses Charged: Non-Billable Expenses: Non-Billable Expenses
Expenses Charged: All Pending Expenses: Pending Approval Expenses
Expenses Charged: All Rejected Expenses: Rejected Expenses
Expenses Charged: Unbilled Expenses: Uninvoiced Expenses
Expenses Charged: All Unsubmitted Expenses: Unsubmitted Expenses
Fees Charged Actual: All Fees Actual Fees
Fees Charged Actual: All [FX] Fees Actual [FX] Fees
Fees Charged Actual: Fixed Fee Tasks Fees Actual: Fixed Fee Tasks Fees
Fees Charged Actual: Invoiced & Paid Fees Actual: Invoiced, Paid Fees
Fees Charged Actual: Invoiced & Unpaid Fees Actual: Invoiced, Unpaid Fees
Fees Charged Actual: Billable T&M Fees Actual: T&M Tasks Fees
WIP Outstanding [sum] - All Fees Actual: T&M Tasks, Uninvoiced Fees
Fees Charged Actual: UnBilled Fees Actual: Uninvoiced Fees
Fees Allocated: All - (RAD) Fees Allocated Fees
Fees Allocated: Billable Projects Fees Allocated: Billable Projects Fees
Fees Projected (T&M base) at EAC: Act+Scheduled (Only Not Completed) Fees EAC: Scheduled, Billable Fees
Fees Allocated from Today: Billable Fees ETC: Allocated, Billable Fees
Fees Scheduled from Today: Billable (Only Not Complete's) Fees ETC: Scheduled, Billable Fees
Fees Scheduled: All Fees Scheduled Fees
Fees Scheduled: Billable Fees Scheduled: Billable Tasks Fees
Fees Scheduled: Fixed Fee Tasks Fees Scheduled: Fixed Fee Tasks Fees
Fees Scheduled: Non-billable Fees Scheduled: Non-Billable Tasks Fees
Fees Scheduled: T&M Tasks Fees Scheduled: T&M Tasks Fees
Fees Charged Actual: Invoiced Fees: Invoiced Fees
_Filter by Organization for Workspace Filter: Projects by Organization Filters
_Filter by Project Group Filter: Projects by Project Group Filters
_Filter by Projects Through Participation Filter: Projects by User Participation Filters
_Filter by Project Filter: Tasks by Project Filters
_Filter by Tags Filter: Tasks by Tag Filters
_Filter by User Through Assignments Filter: Tasks by User Assignment Filters
_Filter by Organization for Users Filter: Users by Organization Filters
_Filter by User Skill Name Filter: Users by User Skill Name Filters
Expense Approved Flag Flag: Expense Approval Status Flags
Expense Billable Flag Flag: Expense Billable Flags
Time entry entered later than performed Flag: Late Time Entry Flags
Project Overdue Flag Flag: Project Overdue Flags
Task Overdue Flag Flag: Task Overdue Flags
Task Status Flag Flag: Task Status Color Flags
Task Status Flag Flag: Task Status Name Flags
Time Entry Approved Flag Flag: Time Entry Approved Flags
Billable Flag from Time Entry Flag: Time Entry Billable / Non-Billable Flags
Time Entry Requires Approval Flag Flag: Time Entry Requires Approval Flags
Time Entry Submitted Flag Flag: Time Entry Submitted Flags
FX Rate [Lift] FX Rate Rates
FX Rate [Master] FX Rate by Currency Rates
Hours Actual: All Hours Actual Hours
Hours Actual: All Approved Hours Actual: Approved Hours
Hours Actual: Billable Hours Actual: Billable Hours
Hours Actual: Non Billable Hours Actual: Non-Billable Hours
Hours Actual: Non-Billable/Non-Productive Projects w/o PTO Hours Actual: Non-Billable, [Admin] & [Internal] Projects Hours
Hours Actual: Submitted yet Unapproved Hours Actual: Pending Approval Hours
Total Productive Hours Hours Actual: Productive Hours Hours
Hours Actual: All Rejected Hours Actual: Rejected Hours
Hours Actual: All Unsubmitted Hours Actual: Unsubmitted Hours
Hours Allocated: All (RAD) Hours Allocated Hours
Hours Allocated: Non-Billable/Non-Productive Projects PTO Only Hours Allocated: [PTO] Projects Hours
Allocated Hours: Billable Projects Hours Allocated: Billable Projects Hours
Allocated Hours: Non-Billable Projects Hours Allocated: Non-Billable Projects Hours
Hours Allocated: Non-Billable/Non-Productive Projects Hours Allocated: Non-Billable, [Admin] & [Internal] Projects Hours
Unstaffed Demand Hours Hours Allocated: Unstaffed Demand Hours
Hours EAC: via Actuals + Allocated Hours EAC: Actual + Allocated Hours
Hours EAC: via Actuals + Sched Hours EAC: Actual + Scheduled Hours
Hours Allocated: Projects From 'Today' (shared) Hours ETC: Allocated Hours
Hours Scheduled: From 'Today' (shared) and Task not Completed Hours ETC: Scheduled Hours
Hours Scheduled: All Hours Scheduled Hours
Hours Scheduled: Billable Hours Scheduled: Billable Hours
Hours Scheduled: Non-Billable Hours Scheduled: Non-Billable Hours
Hours Scheduled: Non-Billable/Non-Productive Projects Hours Scheduled: Non-Billable, [Admin] & [Internal] Projects Hours
Hours Scheduled: Non-Billable Hours Projects PTO Only (All Filters) Hours Scheduled: Non-Billable, [PTO] Projects Hours
Hours Variance: Actual vs Scheduled Hours Variance: Actual vs Scheduled Hours
Hours Variance: Actual PTD vs Target Hours Variance: Actual vs Target to Date Hours
Hours Variance: Task Budget to Actual Current Period Hours Variance: Actual vs Task Estimated Hours Hours
WorkWeek Variance Hours Variance: Actual vs Workday Hours Hours
Hours Variance: Billable Actual vs Billable Scheduled Hours Variance: Actual: Billable vs Scheduled: Billable Hours
Hours Variance: Billable Actual vs Target Hours Variance: Actual: Billable vs Utilization Target Hours
Invoice Amount [sum] Invoice Amount Invoices
Addnl Items Invoiced Amount Invoice Amount: Additional Items Invoices
Addnl Items Invoiced Amount - Paid Invoice Amount: Additional Items, Paid Invoices
Addnl Items Invoiced Amount - Unpaid Invoice Amount: Additional Items, Unpaid Invoices
Invoice Amount, Buildup from Components Invoice Amount: By Component Invoices
Expenses Charged: Paid Invoice Amount: Expenses, Paid Expenses
Expenses Charged: Unpaid Invoice Amount: Expenses, Unpaid Expenses
Fixed Fees Invoiced Amount Invoice Amount: Fixed Fee Invoices
Fixed Fees Invoiced Amount: Paid Invoice Amount: Fixed Fee, Paid Invoices
Fixed Fees Remaining to Invoice Invoice Amount: Fixed Fee, Remaining Invoices
Fixed Fees Invoiced Amount: Unpaid Invoice Amount: Fixed Fee, Unpaid Invoices
Invoice Amount, Paid [sum] Invoice Amount: Paid Invoices
Invoice Amount, Outstanding [sum] Invoice Amount: Unpaid Invoices
Invoice Amount, Current Outstanding [sum] Invoice Amount: Unpaid, Future Invoices
Invoice Amount, Late Outstanding [sum] Invoice Amount: Unpaid, Past Due Invoices
Invoice Tax Rate [Sum] Invoice Tax Rate Invoices
Margin %: Fixed Project Budget Based (EAC Actual+Allocated) Margin %: EAC Project Budget, Allocated Margin and Cost
Margin %: Fixed Project Budget Level (EAC Actual+Scheduled) Margin %: EAC Project Budget, Scheduled Margin and Cost
Margin (simple) % : Includes Non-billable costs Margin %: Fees Margin and Cost
Margin %: Project Target Margin %: Project Target Margin and Cost
Margin: Fixed Project Budget Based (EAC Actual+Allocated) Margin: EAC Project Budget, Allocated Margin and Cost
Margin: Fixed Project Budget Based (EAC Actual+Schedule) Margin: EAC Project Budget, Scheduled Margin and Cost
Margin (simple) Actual: Includes Non-Billable Expenses Margin: Fees Margin and Cost
Number of Allocations Number of Days: Allocated Users and Resources
Number of Schedules Number of Days: Scheduled Users and Resources
Task Past Due Days Number of Days: Task Overdue Tasks
Days Until Project Due Number of Days: Until Project Due Projects
Number of Expenses Number of Expenses Expenses
Number of Invoices Number of Invoices Invoices
Projects [count] Number of Projects Projects
Number of Resouces Number of Resources Users and Resources
Assignment Count Number of Task Assignments Users and Resources
Tasks [count]: All Task Types Number of Tasks Tasks and Task Counts
Count of Tasks - Complete by task Number of Tasks: Completed Tasks
Deliverables [count] Number of Tasks: Deliverable Tasks and Task Counts
Tasks [count]: Open Issues Number of Tasks: Issues Outstanding Tasks
Milestones [count] Number of Tasks: Milestone Tasks
Tasks [count] Open All Types Number of Tasks: Not Completed Tasks
Count of Tasks - Not Started Number of Tasks: Not Started Tasks
Tasks [count] Past due Number of Tasks: Past Due Tasks
Count of Tasks - Started Number of Tasks: Started Tasks
Users [count] In Account Number of Users Users and Resources
Users [count] with Story Assignments Number of Users Assigned to Tasks Users and Resources
Timesheets by Week Count: Incomplete Number of Users with Incomplete Timesheets by Week Users and Resources
Timesheets by Week Count: Missing Number of Users with Missing Timesheets by Week Users and Resources
Hours Actual: Non-Billable/Non-Productive Projects PTO Only (All Filters) Out of Office: [PTO] Projects Workday and Capacity
OOO: % Time Out of Office Out of Office: % Time Out of Office Workday and Capacity
Holiday Utilization PTD Out of Office: Holiday Time % Workday and Capacity
OOO: Holiday Time in Hours (IFNULL) Out of Office: Holiday Time in Hours Workday and Capacity
OOO: Time Off in Hours Out of Office: Time Off Workday and Capacity
OOO: Time Off in Hours + [PTO] Out of Office: Time Off + [PTO] Workday and Capacity
OOO: Holiday Time + Time Off in Hours (IFNULL) Out of Office: Time Off + Holidays Workday and Capacity
Top Level % Complete Project % Complete: Top-Level Tasks (% Done) Projects
Project Amount Paid Project Amount Paid Projects
Project Budget [Sum] Project Budget Projects
Budget Dollar Burn Project Budget: Fees Burn % Projects
Project Budget (Lift) for Tasks Project Budget: Lifted Projects
Project Original Budget Project Budget: Original Projects
Budget remaining at Project Level Project Budget: Remaining, Fees Projects
Project Duration Days: Completed-Start Project Duration: Completed-Start Projects
Project Duration Days: Due-Start Project Duration: Due-Start Projects
Current Health Status Color Project Health Color: All Types Projects
Project Health: Budget color Status Project Health Color: Budget Projects
Project Health: Client Color Status Project Health Color: Client Projects
Project Health: Overall Color Status Project Health Color: Overall Projects
Project Health: Schedule Color Status Project Health Color: Schedule Projects
Project Health: Scope Color Status Project Health Color: Scope Projects
Current Project Status Color [Flag] Project Status Color Projects
Task Percentage Complete [Sum] Task % Complete Tasks
Task % Complete: Actual / Estimated Hours Task % Complete: Actual ÷ Estimated Hours Tasks
Assignment Estimated Hours: User Level Task Assignment Estimated Hours Tasks
Task Budget Estimate [Sum] Task Estimated Budget Tasks
Budget Used % Task Estimated Budget: Fees Burn % Tasks
Task Budget Estimate [Sum] - Fixed Task Estimated Budget: Fixed Fee Tasks
Task Budget Estimate [Sum] -Fixed and Complete Task Estimated Budget: Fixed Fee, Completed Tasks
Budget Remaining Task Estimated Budget: Remaining Tasks
Task Budget Estimate [Sum] -T&M Task Estimated Budget: T&M Tasks
Task Hours Estimate [Sum] Task Estimated Hours Tasks
Task Hours Estimate: Split by User Task Estimated Hours: Split by User Tasks
Task Weight [Sum] Task Weight % Tasks
Users Cost Rate (from User Record) User Cost Rate Rates
Utilization %: Actual Billable [net PTO denominator] Utilization Actual: Billable Utilization and Availability
Utilization %: Actual Billable To Date [net PTO] Utilization Actual: Billable, To Date Utilization and Availability
Non-Productive Utilization Utilization Actual: Non-Productive, To Date Utilization and Availability
Productive Utilization Utilization Actual: Productive, To Date Utilization and Availability
Utilization %: Actual to Date [net PTO] Utilization Actual: To Date Utilization and Availability
Utilization %: Allocated [net PTO] Utilization Allocated Utilization and Availability
Utilization %: Allocated to Date [net PTO] Utilization Allocated: To Date Utilization and Availability
Utilization %: Scheduled [net PTO] Utilization Scheduled Utilization and Availability
Utilization %: Scheduled on Billable Tasks Utilization Scheduled: Billable Utilization and Availability
Utilization %: Scheduled on Billable To 'Today' Utilization Scheduled: Billable, To Date Utilization and Availability
Utilization %: Scheduled Utilization to Date [net PTO] Utilization Scheduled: To Date Utilization and Availability
Users Billability Target % from User Record Utilization Target %: Current Utilization and Availability
Users Effective Billability Target % from User Record Utilization Target %: Dynamic Utilization and Availability
Target Utilization in Hours by User Utilization Target Hours Utilization and Availability
Target Utilization %: Aggregate Weighted Utilization Target: Weighted Average Utilization and Availability
Unlogged Percentage Utilization: Unlogged Hours Utilization and Availability
Workday Time in Hours Workday Hours Workday and Capacity
Workday Time in Hours: Including Time Off & Holidays Workday Hours + Time Off + Holidays Workday and Capacity
Workday Time in Hours: Net of Actual [PTO] Workday Hours: Net Actual [PTO] Workday and Capacity
Workday Time in Hours: Net of Allocated [PTO] Workday Hours: Net Allocated [PTO] Workday and Capacity
Workday Time in Hours: Net of Scheduled [PTO] Workday Hours: Net Scheduled [PTO] Workday and Capacity
! _Global Date [Max] w/ Check ,! _Global Date [Max] w/ Check ͺSystem
! Count of T&M Tasks ,! Count of T&M Tasks ͺSystem
! SK 2021 Rev Est New ,! SK 2021 Rev Est New ͺSystem
[Legacy] ! Utilization %: Actual Billable JR TEST ,[Legacy] ! Utilization %: Actual Billable JR TEST ͺSystem
[Legacy] Hours Potential: TE ,[Legacy] Hours Potential: TE ͺSystem
[Legacy]_Possible Workday Hours in a Period [sum] - SAD ,[Legacy]_Possible Workday Hours in a Period [sum] - SAD ͺSystem
[Legacy]Availability by Week [ForOpen] ,[Legacy]Availability by Week [ForOpen] ͺSystem
[Legacy]Hours Potential: SAD by Month ,[Legacy]Hours Potential: SAD by Month ͺSystem
[Legacy]Hours Potential: SAD by Week (Shared) ,[Legacy]Hours Potential: SAD by Week (Shared) ͺSystem
[Legacy]Hours Potential: SAD by Week [For open] ,[Legacy]Hours Potential: SAD by Week [For open] ͺSystem
[Legacy]Hours Potential: SAD by Week(All Users) ,[Legacy]Hours Potential: SAD by Week(All Users) ͺSystem
[Legacy]Hours Potential: TE + user count ,[Legacy]Hours Potential: TE + user count ͺSystem
[Legacy]Hours Potential: TE All Users ,[Legacy]Hours Potential: TE All Users ͺSystem
[Legacy]Hours Potential: TE by week (shared) ,[Legacy]Hours Potential: TE by week (shared) ͺSystem
[Legacy]Utilization [%] Projected ,[Legacy]Utilization [%] Projected ͺSystem
[Legacy]Utilization: Total ,[Legacy]Utilization: Total ͺSystem
# of Active Projects ,# of Active Projects ͺSystem
% Complete - Actual / Estimated Hours with proj status ,% Complete - Actual / Estimated Hours with proj status ͺSystem
% Complete In Scope ,% Complete In Scope ͺSystem
% Complete Revenue Recognition Method ,% Complete Revenue Recognition Method ͺSystem
% Hours Actual: In Default Role ,% Hours Actual: In Default Role ͺSystem
% Hours Actual: Outside of Default Role ,% Hours Actual: Outside of Default Role ͺSystem
% Invoice Consumed ,% Invoice Consumed ͺSystem
% of Tasks marked complete in Project ,% of Tasks marked complete in Project ͺSystem
% of Time Spent ,% of Time Spent ͺSystem
Active User Detect (Hours & Workweek) ,Active User Detect (Hours & Workweek) ͺSystem
Actual Expenses (last 30 Days) ,Actual Expenses (last 30 Days) ͺSystem
Actual Fees <= Global Date ,Actual Fees <= Global Date ͺSystem
Actual Fees <= Global Date - Project Status: Blue ,Actual Fees <= Global Date - Project Status: Blue ͺSystem
Actual Fees <= Global Date - Project Status: Green ,Actual Fees <= Global Date - Project Status: Green ͺSystem
Actual Fees <= Global Date - Project Status: Grey ,Actual Fees <= Global Date - Project Status: Grey ͺSystem
Actual Fees <= Global Date - Project Status: Light Green ,Actual Fees <= Global Date - Project Status: Light Green ͺSystem
Actual Fees <= Global Date - Project Status: Red ,Actual Fees <= Global Date - Project Status: Red ͺSystem
Actual Fees <= Global Date - Project Status: Yellow ,Actual Fees <= Global Date - Project Status: Yellow ͺSystem
Actual Hours (last 30 Days) ,Actual Hours (last 30 Days) ͺSystem
Actual Hours <= Global Date ,Actual Hours <= Global Date ͺSystem
_Actual Hours less than workweek and greater than zero ,Actual Hours less than workweek and greater than zero ͺSystem
Actual Hours/Cost Detect ,Actual Hours/Cost Detect ͺSystem
Actual Hours/Cost Identifier ,Actual Hours/Cost Identifier ͺSystem
Addnl Items Invoiced Amount: Taxable ,Addnl Items Invoiced Amount: Taxable ͺSystem
Admin/Internal Hours ,Admin/Internal Hours ͺSystem
Admin/Internal w/o Billable Filters ,Admin/Internal w/o Billable Filters ͺSystem
All Story Weight ,All Story Weight ͺSystem
All Story Weight by Workspace Fact ,All Story Weight by Workspace Fact ͺSystem
All Workspace Budget ,All Workspace Budget ͺSystem
Allocated (RAD) Hours: Billable to Target % ,Allocated (RAD) Hours: Billable to Target % ͺSystem
Allocated Cost > Global Date ,Allocated Cost > Global Date ͺSystem
Allocated Fees: Billable Projects ,Allocated Fees: Billable Projects ͺSystem
Allocated Hours (last or next 30 Days) ,Allocated Hours (last or next 30 Days) ͺSystem
Allocated Hours: Availability % ,Allocated Hours: Availability % ͺSystem
Allocated PTO+Time Off+Holidays ,Allocated PTO+Time Off+Holidays ͺSystem
Allocated vs. Scheduled Hours Varianc ,Allocated vs. Scheduled Hours Varianc ͺSystem
Allocation % (Named Resources) ,Allocation % (Named Resources) ͺSystem
Allocation Hours: Hard without pf ,Allocation Hours: Hard without pf ͺSystem
Allocation Hours: Soft without pf ,Allocation Hours: Soft without pf ͺSystem
Assignment Allocated Hours ,Assignment Allocated Hours ͺSystem
Assignment Estimated Hours: Sum of All Users on Task ,Assignment Estimated Hours: Sum of All Users on Task ͺSystem
Assignment Estimated Hours: User Level with Ifnull ,Assignment Estimated Hours: User Level with Ifnull ͺSystem
Assignment Estimated Minutes [Sum] ,Assignment Estimated Minutes [Sum] ͺSystem
Availability FTE's ,Availability FTE's ͺSystem
Availability: Days ,Availability: Days ͺSystem
Availability: Hours by User ,Availability: Hours by User ͺSystem
Availability: Resource Hours by Project ,Availability: Resource Hours by Project ͺSystem
Availability: Schedule + Plan % ,Availability: Schedule + Plan % ͺSystem
Availability: Schedule + Plan Hours ,Availability: Schedule + Plan Hours ͺSystem
Average Bill Rate Revenue base (check fixed/T&M and complete) ,Average Bill Rate Revenue base (check fixed/T&M and complete) ͺSystem
Average Billable Bill Rate by Month ,Average Billable Bill Rate by Month ͺSystem
Average Billable Bill Rate Monthly ,Average Billable Bill Rate Monthly ͺSystem
Average Billing Rate ,Average Billing Rate ͺSystem
Average Billing Rate (simple) Factoring All time all T&M Tasks ,Average Billing Rate (simple) Factoring All time all T&M Tasks ͺSystem
Average Combined Bill Rate by Month ,Average Combined Bill Rate by Month ͺSystem
Average Combined Bill Rate Monthly ,Average Combined Bill Rate Monthly ͺSystem
Average Count of Users per Task ,Average Count of Users per Task ͺSystem
Average Fees ,Average Fees ͺSystem
Average Project Length ,Average Project Length ͺSystem
Billable Hours by TE ,Billable Hours by TE ͺSystem
Billing Rate - Calculated from Time Entry Record ,Billing Rate - Calculated from Time Entry Record ͺSystem
Boolean Include Recognized Projects ,Boolean Include Recognized Projects ͺSystem
Budget Consumed % :Fees Only ,Budget Consumed % :Fees Only ͺSystem
Budget Health: Burn of T&M (Fees) or Fixed (Cost) ,Budget Health: Burn of T&M (Fees) or Fixed (Cost) ͺSystem
Budget of Project for use in Task Milestone Weighting ,Budget of Project for use in Task Milestone Weighting ͺSystem
Budget Remaining ,Budget Remaining ͺSystem
Budget Remaining Runsum for Monthly Burn ,Budget Remaining Runsum for Monthly Burn ͺSystem
Budget Remaining: Current Month Static ,Budget Remaining: Current Month Static ͺSystem
Budget Remaining: Task Rollup, Including Future Scheduled (EAC) ,Budget Remaining: Task Rollup, Including Future Scheduled (EAC) ͺSystem
Budget Rollup Variance (Project vs Tasks) ,Budget Rollup Variance (Project vs Tasks) ͺSystem
Budget Variance (Actual Fees vs Budget) ,Budget Variance (Actual Fees vs Budget) ͺSystem
Budget Variance (EAC vs Budget) ,Budget Variance (EAC vs Budget) ͺSystem
Calendar_Shared_Date Counter ,Calendar_Shared_Date Counter ͺSystem
Calendar_Shared_Date Counter w/Today ,Calendar_Shared_Date Counter w/Today ͺSystem
Calendar_Shared_Min for Month ,Calendar_Shared_Min for Month ͺSystem
Completed Projects [count] ,Completed Projects [count] ͺSystem
Copy of Projected Fees [sum] - T&M [by All Time] ,Copy of Projected Fees [sum] - T&M [by All Time] ͺSystem
Cost % Complete: Actual / EAC ,Cost % Complete: Actual / EAC ͺSystem
Cost + NB Exp ITD ,Cost + NB Exp ITD ͺSystem
Cost + Non-Billable Expenses, Actual by all other ,Cost + Non-Billable Expenses, Actual by all other ͺSystem
Cost + Non-Billable Expenses, Actual Running Summary ,Cost + Non-Billable Expenses, Actual Running Summary ͺSystem
Cost + Non-Billable Expenses, Actual to date + runsum of projected ,Cost + Non-Billable Expenses, Actual to date + runsum of projected ͺSystem
Cost + Non-Billable Expenses, Actual to date + runsum of projected ... ,Cost + Non-Billable Expenses, Actual to date + runsum of projected ... ͺSystem
Cost <= Global Date ,Cost <= Global Date ͺSystem
Cost Dollar Burn ,Cost Dollar Burn ͺSystem
Cost EAC + NB Exp ,Cost EAC + NB Exp ͺSystem
Cost EAC + NB Exp: Allocations ,Cost EAC + NB Exp: Allocations ͺSystem
Cost EAC + NB Exp: Schedules ,Cost EAC + NB Exp: Schedules ͺSystem
Cost EAC with PA Check ,Cost EAC with PA Check ͺSystem
Cost EAC: % Complete Method Estimated : incl expenses ,Cost EAC: % Complete Method Estimated : incl expenses ͺSystem
Cost EAC: % Complete Method Estimated: Rollup for Project Level ,Cost EAC: % Complete Method Estimated: Rollup for Project Level ͺSystem
Cost EAC: via Actuals + Allocated Global Date ,Cost EAC: via Actuals + Allocated Global Date ͺSystem
Cost EAC: via Actuals + Scheduled Global Date ,Cost EAC: via Actuals + Scheduled Global Date ͺSystem
Cost ETC: Scheduled (old) ,Cost ETC: Scheduled (old) ͺSystem
Cost Scheduled > Global Date ,Cost Scheduled > Global Date ͺSystem
Cost, Actual by all other ,Cost, Actual by all other ͺSystem
Cost, Actual Running Summary ,Cost, Actual Running Summary ͺSystem
Cost, Actual to date + runsum of projected ,Cost, Actual to date + runsum of projected ͺSystem
Cost, Actual to date + runsum of projected w/ Allo ,Cost, Actual to date + runsum of projected w/ Allo ͺSystem
Cost, Projected Runsum: From Today ,Cost, Projected Runsum: From Today ͺSystem
Cost, Projected Runsum: From Today w/ Allo ,Cost, Projected Runsum: From Today w/ Allo ͺSystem
Cost: % Complete Method Estimated ,Cost: % Complete Method Estimated ͺSystem
Count of Allocated Days ,Count of Allocated Days ͺSystem
Count of Completed Tasks Due this month ,Count of Completed Tasks Due this month ͺSystem
Count of Delayed Projects ,Count of Delayed Projects ͺSystem
Count of Estimates: 0-29% Opportunity Confidence ,Count of Estimates: 0-29% Opportunity Confidence ͺSystem
Count of Estimates: 30-59% Opportunity Confidence ,Count of Estimates: 30-59% Opportunity Confidence ͺSystem
Count of Estimates: 60-79% Opportunity Confidence ,Count of Estimates: 60-79% Opportunity Confidence ͺSystem
Count of Estimates: 80-100% Opportunity Confidence ,Count of Estimates: 80-100% Opportunity Confidence ͺSystem
Count of Estimates: All ,Count of Estimates: All ͺSystem
Count of Estimates: Locked ,Count of Estimates: Locked ͺSystem
Count of Fixed Top Level Tasks ,Count of Fixed Top Level Tasks ͺSystem
Count of GREEN Projects [Budget Status] ,Count of GREEN Projects [Budget Status] ͺSystem
Count of GREEN Projects [Client Status] ,Count of GREEN Projects [Client Status] ͺSystem
Count of GREEN Projects [Overall Status] ,Count of GREEN Projects [Overall Status] ͺSystem
Count of GREEN Projects [Schedule Status] ,Count of GREEN Projects [Schedule Status] ͺSystem
Count of GREEN Projects [Scope Status] ,Count of GREEN Projects [Scope Status] ͺSystem
Count of GREY Projects [Budget Status] ,Count of GREY Projects [Budget Status] ͺSystem
Count of GREY Projects [Client Status] ,Count of GREY Projects [Client Status] ͺSystem
Count of GREY Projects [Overall Status] ,Count of GREY Projects [Overall Status] ͺSystem
Count of GREY Projects [Schedule Status] ,Count of GREY Projects [Schedule Status] ͺSystem
Count of GREY Projects [Scope Status] ,Count of GREY Projects [Scope Status] ͺSystem
Count of Other Tasks by month ,Count of Other Tasks by month ͺSystem
Count of Overbudget EAC projects ,Count of Overbudget EAC projects ͺSystem
Count of Overbudget projects ,Count of Overbudget projects ͺSystem
Count of RED Projects [Budget Status] ,Count of RED Projects [Budget Status] ͺSystem
Count of RED Projects [Client Status] ,Count of RED Projects [Client Status] ͺSystem
Count of RED Projects [Overall Status] ,Count of RED Projects [Overall Status] ͺSystem
Count of RED Projects [Schedule Status] ,Count of RED Projects [Schedule Status] ͺSystem
Count of RED Projects [Scope Status] ,Count of RED Projects [Scope Status] ͺSystem
Count of Resource Assignments on Task [Lift] ,Count of Resource Assignments on Task [Lift] ͺSystem
Count of Resources ,Count of Resources ͺSystem
Count of Roles ,Count of Roles ͺSystem
Count of Started Tasks Due this month ,Count of Started Tasks Due this month ͺSystem
Count of Tasks ,Count of Tasks ͺSystem
Count of Tasks - Complete ,Count of Tasks - Complete ͺSystem
Count of Tasks That Should be Complete by Today ,Count of Tasks That Should be Complete by Today ͺSystem
Count of Tasks That Should be Complete by Today by Task ,Count of Tasks That Should be Complete by Today by Task ͺSystem
Count of Unnamed Resource Titles ,Count of Unnamed Resource Titles ͺSystem
Count of User Assignments on Task ,Count of User Assignments on Task ͺSystem
Count of Utilization Target Changes ,Count of Utilization Target Changes ͺSystem
Count of YELLOW Projects [Budget Status] ,Count of YELLOW Projects [Budget Status] ͺSystem
Count of YELLOW Projects [Client Status] ,Count of YELLOW Projects [Client Status] ͺSystem
Count of YELLOW Projects [Overall Status] ,Count of YELLOW Projects [Overall Status] ͺSystem
Count of YELLOW Projects [Schedule Status] ,Count of YELLOW Projects [Schedule Status] ͺSystem
Count of YELLOW Projects [Scope Status] ,Count of YELLOW Projects [Scope Status] ͺSystem
Count Tasks with Project Filter ,Count Tasks with Project Filter ͺSystem
Count Tasks with User Filter ,Count Tasks with User Filter ͺSystem
Currency Symbol [Sum] ,Currency Symbol [Sum] ͺSystem
Days Expense Open [lift] (Expense) ,Days Expense Open [lift] (Expense) ͺSystem
Days Sales Outstanding [lift] (Invoice Project) ,Days Sales Outstanding [lift] (Invoice Project) ͺSystem
Days Task Due Date before Global Date(Max) ,Days Task Due Date before Global Date(Max) ͺSystem
Days Until Due ,Days Until Due ͺSystem
Delayed Projects ,Delayed Projects ͺSystem
DSO One Q Ago ,DSO One Q Ago ͺSystem
DSO Two Qs Ago ,DSO Two Qs Ago ͺSystem
Dynamic Input: [Detect Forecast Source] ,Dynamic Input: [Detect Forecast Source] ͺSystem
Dynamic Input: [Detect Revenue Source] ,Dynamic Input: [Detect Revenue Source] ͺSystem
Dynamic Input: Cost (Actual, Allocated, Scheduled) ,Dynamic Input: Cost (Actual, Allocated, Scheduled) ͺSystem
Dynamic Input: EAC Method [Detect Option] ,Dynamic Input: EAC Method [Detect Option] ͺSystem
Dynamic Input: Earliest Date (Actual, Allocated, Scheduled) ,Dynamic Input: Earliest Date (Actual, Allocated, Scheduled) ͺSystem
Dynamic Input: Fees (% Complete) ,Dynamic Input: Fees (% Complete) ͺSystem
Dynamic Input: Fees (Actual, Allocated, Scheduled) ,Dynamic Input: Fees (Actual, Allocated, Scheduled) ͺSystem
Dynamic Input: FF Revenue Project Budget ,Dynamic Input: FF Revenue Project Budget ͺSystem
Dynamic Input: FF Revenue Task Budget ,Dynamic Input: FF Revenue Task Budget ͺSystem
Dynamic Input: Fixed Fee Margin % (Actual, Allocated, Scheduled) ,Dynamic Input: Fixed Fee Margin % (Actual, Allocated, Scheduled) ͺSystem
Dynamic Input: Hours (Actual, Allocated, Scheduled) ,Dynamic Input: Hours (Actual, Allocated, Scheduled) ͺSystem
Dynamic Input: Latest Date (Actual, Allocated, Scheduled) ,Dynamic Input: Latest Date (Actual, Allocated, Scheduled) ͺSystem
Dynamic Input: T&M Margin % (Actual, Allocated, Scheduled) ,Dynamic Input: T&M Margin % (Actual, Allocated, Scheduled) ͺSystem
EAC Actual Hours/Cost Detect ,EAC Actual Hours/Cost Detect ͺSystem
EAC Hours/Cost Detect ,EAC Hours/Cost Detect ͺSystem
Earned Task Hours via % complete (for summary rollup) ,Earned Task Hours via % complete (for summary rollup) ͺSystem
Estimate Budget for Project ,Estimate Budget for Project ͺSystem
Estimate Margin: Fixed Fee ,Estimate Margin: Fixed Fee ͺSystem
Estimate Margin: T&M ,Estimate Margin: T&M ͺSystem
Estimate Scenario: Allocated Fees ,Estimate Scenario: Allocated Fees ͺSystem
Estimate Scenario: Allocated Hours (Estimates Only) ,Estimate Scenario: Allocated Hours (Estimates Only) ͺSystem
Estimate Scenario: Budget ,Estimate Scenario: Budget ͺSystem
Estimate Scenario: Conversion Rate % ,Estimate Scenario: Conversion Rate % ͺSystem
Estimate Scenario: Favorite Flag ,Estimate Scenario: Favorite Flag ͺSystem
Estimate Scenario: Project Created Flag ,Estimate Scenario: Project Created Flag ͺSystem
Estimate: Average Confidence ,Estimate: Average Confidence ͺSystem
Estimated hours baseline by User with Split Check ,Estimated hours baseline by User with Split Check ͺSystem
Execution Health: EAC Hours Schedule <> Task Est ,Execution Health: EAC Hours Schedule <> Task Est ͺSystem
Execution Health: Start within 2 weeks and No Schedule ,Execution Health: Start within 2 weeks and No Schedule ͺSystem
Execution Health: Task Consolidated ,Execution Health: Task Consolidated ͺSystem
Execution Health: Task Late Start ,Execution Health: Task Late Start ͺSystem
Execution Health: Task Past Due or Empty (with/out Hours) ,Execution Health: Task Past Due or Empty (with/out Hours) ͺSystem
Execution Health: Tasks without Dates with/without Hours ,Execution Health: Tasks without Dates with/without Hours ͺSystem
Expected Task Burndown ,Expected Task Burndown ͺSystem
Expected Task Remaining ,Expected Task Remaining ͺSystem
Expenses Charged: Fixed Fee Tasks: Simple ,Expenses Charged: Fixed Fee Tasks: Simple ͺSystem
Expenses Charged: Non-Billable (Expense Record) ,Expenses Charged: Non-Billable (Expense Record) ͺSystem
Expenses Charged: Not Requiring Approval ,Expenses Charged: Not Requiring Approval ͺSystem
Expenses Charged: Sum of Unpaid, Paid and Unbilled ,Expenses Charged: Sum of Unpaid, Paid and Unbilled ͺSystem
Expenses Charged: Taxable ,Expenses Charged: Taxable ͺSystem
Fees Allocated from Today: Billable (runsum) ,Fees Allocated from Today: Billable (runsum) ͺSystem
Fees Burn % EAC to budget ,Fees Burn % EAC to budget ͺSystem
Fees Burn % Project Budget ,Fees Burn % Project Budget ͺSystem
Fees Charged Actual plus Non-Bill Expenses: Fixed Fee Tasks ,Fees Charged Actual plus Non-Bill Expenses: Fixed Fee Tasks ͺSystem
Fees Charged Actual: All by all other ,Fees Charged Actual: All by all other ͺSystem
Fees Charged Actual: Billable ,Fees Charged Actual: Billable ͺSystem
Fees Charged Actual: Billable T&M by Story ,Fees Charged Actual: Billable T&M by Story ͺSystem
Fees Charged Actual: Current Month ,Fees Charged Actual: Current Month ͺSystem
Fees Charged Actual: Fixed Fee Tasks Completed ,Fees Charged Actual: Fixed Fee Tasks Completed ͺSystem
Fees Charged Actual: Invoiced and Taxable ,Fees Charged Actual: Invoiced and Taxable ͺSystem
Fees Charged Running Summary ,Fees Charged Running Summary ͺSystem
Fees Combined Actual to date plus projected from today ,Fees Combined Actual to date plus projected from today ͺSystem
Fees Combined Actual to date plus projected from today w/ Allo ,Fees Combined Actual to date plus projected from today w/ Allo ͺSystem
Fees EAC with Global Date ,Fees EAC with Global Date ͺSystem
Fees Last Year ,Fees Last Year ͺSystem
Fees Projected (T&M base) at EAC: Act+Allocated (Only Not Completed) ,Fees Projected (T&M base) at EAC: Act+Allocated (Only Not Completed) ͺSystem
Fees Projected Allocated: All - (RAD) ,Fees Projected Allocated: All - (RAD) ͺSystem
Fees Projected for T&M at EAC: % Complete Method (Compete Tasks tak... ,Fees Projected for T&M at EAC: % Complete Method (Compete Tasks tak... ͺSystem
Fees Remaining to be Scheduled relative to Budget ,Fees Remaining to be Scheduled relative to Budget ͺSystem
Fees Remaining to be Scheduled relative to Budget(T&M) BY Story ,Fees Remaining to be Scheduled relative to Budget(T&M) BY Story ͺSystem
Fees Scheduled from Today: Billable ,Fees Scheduled from Today: Billable ͺSystem
Fees Scheduled from Today: Billable (runsum) ,Fees Scheduled from Today: Billable (runsum) ͺSystem
FH Margin % ,FH Margin % ͺSystem
_Filter Converted Scenarios Option ,Filter Converted Scenarios Option ͺSystem
_Filter Dynamic Input Options A, B, C Only (Available Values Filter) ,Filter Dynamic Input Options A, B, C Only (Available Values Filter) ͺSystem
_Filter Expense Date by Global Date ,Filter Expense Date by Global Date ͺSystem
_Filter for Projects: Non-Billable/Non-Productive Projects with PTO ,Filter for Projects: Non-Billable/Non-Productive Projects with PTO ͺSystem
_Filter for Zero WIP, Unpaid and Paid Invoices ,Filter for Zero WIP, Unpaid and Paid Invoices ͺSystem
_Filter Out (empty value) Estimates ,Filter Out (empty value) Estimates ͺSystem
_Filter Projects only when Group Selected ,Filter Projects only when Group Selected ͺSystem
_Filter Projects to selected Group ,Filter Projects to selected Group ͺSystem
_Filter SAD Date by Timeline ,Filter SAD Date by Timeline ͺSystem
_Filter Shared Days within Global Dates ,Filter Shared Days within Global Dates ͺSystem
_Filter Shared Months from Current Global + 5 ,Filter Shared Months from Current Global + 5 ͺSystem
_Filter Task by User AND Project ,Filter Task by User AND Project ͺSystem
_Filter TE Date Performed by Timeline ,Filter TE Date Performed by Timeline ͺSystem
_Filter where both Actuals and Target Hours is Zero ,Filter where both Actuals and Target Hours is Zero ͺSystem
_Filter Workspace by Estimate Scenario Only ,Filter Workspace by Estimate Scenario Only ͺSystem
_Filter Workspace by Estimate Scenario Option ,Filter Workspace by Estimate Scenario Option ͺSystem
_Final Rolloff Date within selected period(Global) ? ,Final Rolloff Date within selected period(Global) ? ͺSystem
Final Scheduled Date by User: Calculated ,Final Scheduled Date by User: Calculated ͺSystem
Final Scheduled Date by User: Date Formatted ,Final Scheduled Date by User: Date Formatted ͺSystem
Fixed Fees Invoiced Amount: Running Summary for Monthly Burn ,Fixed Fees Invoiced Amount: Running Summary for Monthly Burn ͺSystem
Fixed Fees Invoiced Amount: Taxable ,Fixed Fees Invoiced Amount: Taxable ͺSystem
Fixed/T&M/Mixed Identification by Project ,Fixed/T&M/Mixed Identification by Project ͺSystem
Forecast Fees (Allocated, Scheduled) [DI] ,Forecast Fees (Allocated, Scheduled) [DI] ͺSystem
Forecast Fees (Allocated, Scheduled) [Inner] ,Forecast Fees (Allocated, Scheduled) [Inner] ͺSystem
Forecast Fees (Dynamic Input: Allocated, Scheduled) [FX] ,Forecast Fees (Dynamic Input: Allocated, Scheduled) [FX] ͺSystem
Foregone Margin of Unscheduled on Workweek Day by User ,Foregone Margin of Unscheduled on Workweek Day by User ͺSystem
Future Forecast Fees (Allocated, Scheduled) > Global Date ,Future Forecast Fees (Allocated, Scheduled) > Global Date ͺSystem
FX Rate Average ,FX Rate Average ͺSystem
_Global Date [min] w/ Check ,Global Date [min] w/ Check ͺSystem
_Global Month ,Global Month ͺSystem
Hours Actual outside of WorkWeek Calendar ,Hours Actual outside of WorkWeek Calendar ͺSystem
Hours Actual outside of WorkWeek Calendar[sum for headline] ,Hours Actual outside of WorkWeek Calendar[sum for headline] ͺSystem
Hours Actual: [Runsum] ,Hours Actual: [Runsum] ͺSystem
Hours Actual: All (All Users Lift) ,Hours Actual: All (All Users Lift) ͺSystem
Hours Actual: All (Future Dates Only) ,Hours Actual: All (Future Dates Only) ͺSystem
Hours Actual: All (net PTO) ,Hours Actual: All (net PTO) ͺSystem
Hours Actual: All [ifnull] ,Hours Actual: All [ifnull] ͺSystem
Hours Actual: All [ifnull] by User Assignment ,Hours Actual: All [ifnull] by User Assignment ͺSystem
Hours Actual: All Not Requiring Approval ,Hours Actual: All Not Requiring Approval ͺSystem
Hours Actual: All Up to 'Today' ,Hours Actual: All Up to 'Today' ͺSystem
Hours Actual: All Up to 'Today' by all other (lift) ,Hours Actual: All Up to 'Today' by all other (lift) ͺSystem
Hours Actual: All with empty values ,Hours Actual: All with empty values ͺSystem
Hours Actual: All_bkp ,Hours Actual: All_bkp ͺSystem
Hours Actual: Billable [Ifnull] ,Hours Actual: Billable [Ifnull] ͺSystem
Hours Actual: Billable by all Dates ,Hours Actual: Billable by all Dates ͺSystem
Hours Actual: Billable by Non-Billable Users ,Hours Actual: Billable by Non-Billable Users ͺSystem
Hours Actual: Billable on Non-Billable Tasks ,Hours Actual: Billable on Non-Billable Tasks ͺSystem
Hours Actual: Billable Running Summary ,Hours Actual: Billable Running Summary ͺSystem
Hours Actual: by all Dates ,Hours Actual: by all Dates ͺSystem
Hours Actual: In Default Role ,Hours Actual: In Default Role ͺSystem
Hours Actual: Non Billable on Billable Tasks ,Hours Actual: Non Billable on Billable Tasks ͺSystem
Hours Actual: Non Billable w/o Billable PF ,Hours Actual: Non Billable w/o Billable PF ͺSystem
Hours Actual: Non-Billable/Non-Productive Projects PTO Only ,Hours Actual: Non-Billable/Non-Productive Projects PTO Only ͺSystem
Hours Actual: Non-Billable/Non-Productive Projects with PTO ,Hours Actual: Non-Billable/Non-Productive Projects with PTO ͺSystem
Hours Actual: Non-Billable/Productive ,Hours Actual: Non-Billable/Productive ͺSystem
Hours Actual: Outside of Default Role ,Hours Actual: Outside of Default Role ͺSystem
Hours Actual: Running Summary ,Hours Actual: Running Summary ͺSystem
Hours Actual: with no Task ,Hours Actual: with no Task ͺSystem
Hours Allocated > Global Date ,Hours Allocated > Global Date ͺSystem
Hours Allocated Running Summary ,Hours Allocated Running Summary ͺSystem
Hours Allocated Runsum: to-Date plus Allocated from Today ,Hours Allocated Runsum: to-Date plus Allocated from Today ͺSystem
Hours Allocated: All Hours Projects PTO Only ,Hours Allocated: All Hours Projects PTO Only ͺSystem
Hours Allocated: All Hours Projects PTO Only (All Filters) ,Hours Allocated: All Hours Projects PTO Only (All Filters) ͺSystem
Hours Allocated: Estimates Only, All Time ,Hours Allocated: Estimates Only, All Time ͺSystem
Hours Allocated: Non-Billable/Non-Productive Projects - PTO Only ,Hours Allocated: Non-Billable/Non-Productive Projects - PTO Only ͺSystem
Hours Allocated: Non-Billable/Productive ,Hours Allocated: Non-Billable/Productive ͺSystem
Hours Allocated: Projects From 'Today' (shared) and Project not Com... ,Hours Allocated: Projects From 'Today' (shared) and Project not Com... ͺSystem
Hours Allocated: Projects Only ,Hours Allocated: Projects Only ͺSystem
Hours Allocated: to Target % ,Hours Allocated: to Target % ͺSystem
Hours Available [sum] - Scheduled ,Hours Available [sum] - Scheduled ͺSystem
Hours Burn(up) Runsum: Actual-to-Date plus Scheduled from Today ,Hours Burn(up) Runsum: Actual-to-Date plus Scheduled from Today ͺSystem
Hours Burndown from Estimate ,Hours Burndown from Estimate ͺSystem
Hours Burndown from Estimate (w/Null) ,Hours Burndown from Estimate (w/Null) ͺSystem
Hours EAC with PA Check ,Hours EAC with PA Check ͺSystem
Hours EAC: via % Complete ,Hours EAC: via % Complete ͺSystem
Hours EAC: via % Complete: Summary Rollowup ,Hours EAC: via % Complete: Summary Rollowup ͺSystem
Hours EAC: via Actuals + Allocated Global Date ,Hours EAC: via Actuals + Allocated Global Date ͺSystem
Hours EAC: via Actuals + Scheduled Global Date ,Hours EAC: via Actuals + Scheduled Global Date ͺSystem
Hours Master Planned: All ,Hours Master Planned: All ͺSystem
Hours Projected Runsum: Billable-to-Date plus Scheduled from Today ... ,Hours Projected Runsum: Billable-to-Date plus Scheduled from Today ... ͺSystem
Hours Projected Runsum: to-Date plus Scheduled from Today ,Hours Projected Runsum: to-Date plus Scheduled from Today ͺSystem
Hours Scheduled outside of WorkWeek Calendar ,Hours Scheduled outside of WorkWeek Calendar ͺSystem
Hours Scheduled outside of WorkWeek Calendar[sum for headline] ,Hours Scheduled outside of WorkWeek Calendar[sum for headline] ͺSystem
Hours Scheduled past Disabled[sum for headline] ,Hours Scheduled past Disabled[sum for headline] ͺSystem
Hours Scheduled past Task Completed Date ,Hours Scheduled past Task Completed Date ͺSystem
Hours Scheduled Running Summary ,Hours Scheduled Running Summary ͺSystem
Hours Scheduled Running Summary thru 'Today' ,Hours Scheduled Running Summary thru 'Today' ͺSystem
Hours Scheduled Running Summary: From Today ,Hours Scheduled Running Summary: From Today ͺSystem
Hours Scheduled: All [ifnull] ,Hours Scheduled: All [ifnull] ͺSystem
Hours Scheduled: All [ifnull] by User Assignment ,Hours Scheduled: All [ifnull] by User Assignment ͺSystem
Hours Scheduled: All Hours Projects PTO Only ,Hours Scheduled: All Hours Projects PTO Only ͺSystem
Hours Scheduled: All with empty value ,Hours Scheduled: All with empty value ͺSystem
Hours Scheduled: Billable by Non-Billable Users ,Hours Scheduled: Billable by Non-Billable Users ͺSystem
Hours Scheduled: Billable Tasks From 'Today' (shared) and Task not ... ,Hours Scheduled: Billable Tasks From 'Today' (shared) and Task not ... ͺSystem
Hours Scheduled: Billable to Target % ,Hours Scheduled: Billable to Target % ͺSystem
Hours Scheduled: From 'Today' ,Hours Scheduled: From 'Today' ͺSystem
Hours Scheduled: From 'Today' (shared) and Task not Completed [ifnull] ,Hours Scheduled: From 'Today' (shared) and Task not Completed [ifnull] ͺSystem
Hours Scheduled: Non Billable w/o Billable PF ,Hours Scheduled: Non Billable w/o Billable PF ͺSystem
Hours Scheduled: Non-Billable/Non-Productive Projects PTO Only ,Hours Scheduled: Non-Billable/Non-Productive Projects PTO Only ͺSystem
Hours Scheduled: Non-Billable/Non-Productive Projects with PTO ,Hours Scheduled: Non-Billable/Non-Productive Projects with PTO ͺSystem
Hours Scheduled: Non-Billable/Productive ,Hours Scheduled: Non-Billable/Productive ͺSystem
Hours Scheduled: Non-Billable/Productive - Bar Chart ,Hours Scheduled: Non-Billable/Productive - Bar Chart ͺSystem
Hours Scheduled: Tasks From 'Today' (shared) and Task not Completed ,Hours Scheduled: Tasks From 'Today' (shared) and Task not Completed ͺSystem
Hours Scheduled: to Target % ,Hours Scheduled: to Target % ͺSystem
Hours Scheduled: w/Workweek Lift ,Hours Scheduled: w/Workweek Lift ͺSystem
Hours Unscheduled on Workweek Day by User ,Hours Unscheduled on Workweek Day by User ͺSystem
Hours Variance: % Actual to Scheduled ,Hours Variance: % Actual to Scheduled ͺSystem
Hours Variance: Actual vs Capacity ,Hours Variance: Actual vs Capacity ͺSystem
Hours Variance: Billable Forecast to Target Variance ,Hours Variance: Billable Forecast to Target Variance ͺSystem
Hours Variance: Billable PTD Actual vs Target ,Hours Variance: Billable PTD Actual vs Target ͺSystem
Hours Variance: Hours Forecast to Target Variance by Allocation ,Hours Variance: Hours Forecast to Target Variance by Allocation ͺSystem
Hours Variance: Remaining Task Estimate (User or Task %) to ETC ,Hours Variance: Remaining Task Estimate (User or Task %) to ETC ͺSystem
Hours Variance: Task Budget to Actual RunSum ,Hours Variance: Task Budget to Actual RunSum ͺSystem
Hours Variance: Task Budget Total to Actual ,Hours Variance: Task Budget Total to Actual ͺSystem
Hours Variance: Task Schedule to Budget Variance ,Hours Variance: Task Schedule to Budget Variance ͺSystem
Hours: Actual Forecast by Allocation ,Hours: Actual Forecast by Allocation ͺSystem
Hours: Actual OR Scheduled for Heatmap Lifted for Task ,Hours: Actual OR Scheduled for Heatmap Lifted for Task ͺSystem
Hours: Billable Forecast ,Hours: Billable Forecast ͺSystem
Hours: Un-Logged ,Hours: Un-Logged ͺSystem
Hours: Unused from Workweek Capacity ,Hours: Unused from Workweek Capacity ͺSystem
Hours/Cost EAC Recognized ,Hours/Cost EAC Recognized ͺSystem
In Scope Project Count ,In Scope Project Count ͺSystem
Invoice Amount [sum] min ,Invoice Amount [sum] min ͺSystem
Invoice Amount, Late Outstanding 1-30 [sum] ,Invoice Amount, Late Outstanding 1-30 [sum] ͺSystem
Invoice Amount, Late Outstanding 31-60 [sum] ,Invoice Amount, Late Outstanding 31-60 [sum] ͺSystem
Invoice Amount, Late Outstanding 61-90 [sum] ,Invoice Amount, Late Outstanding 61-90 [sum] ͺSystem
Invoice Amount, Late Outstanding 91+ [sum] ,Invoice Amount, Late Outstanding 91+ [sum] ͺSystem
Invoice Amount, Taxes Unpaid [rollup] ,Invoice Amount, Taxes Unpaid [rollup] ͺSystem
Invoice Remaining ,Invoice Remaining ͺSystem
Invoice Remaining for Burn Graph ,Invoice Remaining for Burn Graph ͺSystem
_Is Organization Filtered? ,Is Organization Filtered? ͺSystem
_Is Project Filtered? ,Is Project Filtered? ͺSystem
_Is Project Group Filtered? ,Is Project Group Filtered? ͺSystem
_Is Tag Filtered? ,Is Tag Filtered? ͺSystem
_Is User Filtered? ,Is User Filtered? ͺSystem
_Is User Skill Filtered? ,Is User Skill Filtered? ͺSystem
_Is User Skill Name Filtered? ,Is User Skill Name Filtered? ͺSystem
Last Health Status Date (MAX Date) ,Last Health Status Date (MAX Date) ͺSystem
Last Scheduled Date within period by User: Calculated ,Last Scheduled Date within period by User: Calculated ͺSystem
Last Scheduled Date within period by User: Date Formatted ,Last Scheduled Date within period by User: Date Formatted ͺSystem
Margin ,Margin ͺSystem
Margin (Fixed Fee) Actual: Includes Non-Billable Expenses ,Margin (Fixed Fee) Actual: Includes Non-Billable Expenses ͺSystem
Margin (simple) Actual : Billable ,Margin (simple) Actual : Billable ͺSystem
Margin (simple) Actual : w/o Non-Billable exp ,Margin (simple) Actual : w/o Non-Billable exp ͺSystem
Margin (simple) Projected [%] ,Margin (simple) Projected [%] ͺSystem
Margin (simple) Projected [sum] ,Margin (simple) Projected [sum] ͺSystem
Margin @ Complete Fixed Fee ,Margin @ Complete Fixed Fee ͺSystem
Margin @ EAC via Allo ,Margin @ EAC via Allo ͺSystem
Margin % ,Margin % ͺSystem
Margin % Average ,Margin % Average ͺSystem
Margin % Average (Allo) ,Margin % Average (Allo) ͺSystem
Margin % Average: % Complete Method ,Margin % Average: % Complete Method ͺSystem
Margin % EAC via Allo ,Margin % EAC via Allo ͺSystem
Margin % Variance: Target to EAC Project Level (actual +schedules) ... ,Margin % Variance: Target to EAC Project Level (actual +schedules) ... ͺSystem
Margin %: (Fixed Fee) Actual: Includes Non-Billable Expenses ,Margin %: (Fixed Fee) Actual: Includes Non-Billable Expenses ͺSystem
Margin %: EAC % - Combination Fixed/T&M ,Margin %: EAC % - Combination Fixed/T&M ͺSystem
Margin %: EAC % - Project Level ,Margin %: EAC % - Project Level ͺSystem
Margin %: EAC % Complete - Fixed Task ,Margin %: EAC % Complete - Fixed Task ͺSystem
Margin %: EAC % Complete - T&M ,Margin %: EAC % Complete - T&M ͺSystem
Margin %: EAC Allocated: Project Level ,Margin %: EAC Allocated: Project Level ͺSystem
Margin %: EAC Scheduled - Fixed or T&M ,Margin %: EAC Scheduled - Fixed or T&M ͺSystem
Margin %: EAC Scheduled - Fixed Task ,Margin %: EAC Scheduled - Fixed Task ͺSystem
Margin %: EAC Scheduled - T&M ,Margin %: EAC Scheduled - T&M ͺSystem
Margin %: EAC Scheduled: Project Level ,Margin %: EAC Scheduled: Project Level ͺSystem
Margin %: Fixed or T&M at Project Level_EAC Scheduled ,Margin %: Fixed or T&M at Project Level_EAC Scheduled ͺSystem
Margin %: Project ToDate T&M plus Fixed ,Margin %: Project ToDate T&M plus Fixed ͺSystem
Margin %: ToDate T&M plus Fixed ,Margin %: ToDate T&M plus Fixed ͺSystem
Margin EAC ,Margin EAC ͺSystem
Margin EAC % ,Margin EAC % ͺSystem
Margin EAC % Variance to Target ,Margin EAC % Variance to Target ͺSystem
Margin ITD ,Margin ITD ͺSystem
Margin ITD % ,Margin ITD % ͺSystem
Margin with Costs as Incurred ,Margin with Costs as Incurred ͺSystem
Margin: % Complete - Fixed Task ,Margin: % Complete - Fixed Task ͺSystem
Margin: EAC % - Fixed or T&M ,Margin: EAC % - Fixed or T&M ͺSystem
Margin: EAC % - selects between: Rollup for Project Level ,Margin: EAC % - selects between: Rollup for Project Level ͺSystem
Margin: EAC % Complete - T&M ,Margin: EAC % Complete - T&M ͺSystem
Margin: EAC Allocated - Fixed plus T&M ,Margin: EAC Allocated - Fixed plus T&M ͺSystem
Margin: EAC Allocated - Fixed Task ,Margin: EAC Allocated - Fixed Task ͺSystem
Margin: EAC Allocated - T&M ,Margin: EAC Allocated - T&M ͺSystem
Margin: EAC Scheduled - Fixed plus T&M ,Margin: EAC Scheduled - Fixed plus T&M ͺSystem
Margin: EAC Scheduled - Fixed Task ,Margin: EAC Scheduled - Fixed Task ͺSystem
Margin: EAC Scheduled - T&M ,Margin: EAC Scheduled - T&M ͺSystem
Margin: Revenue Base ,Margin: Revenue Base ͺSystem
Margin: Revenue Base for Fixed and Completed ,Margin: Revenue Base for Fixed and Completed ͺSystem
Margin: Revenue Base for Fixed, Open and Fees<Budget ,Margin: Revenue Base for Fixed, Open and Fees<Budget ͺSystem
Margin: Revenue Base for Fixed, Open and Fees>=Budget ,Margin: Revenue Base for Fixed, Open and Fees>=Budget ͺSystem
Margin: ToDate T&M plus Fixed (task level rollup for fixed) ,Margin: ToDate T&M plus Fixed (task level rollup for fixed) ͺSystem
Margin(Gross) Runsum: Simple Budgets Minus Cost ,Margin(Gross) Runsum: Simple Budgets Minus Cost ͺSystem
Margin(Gross): Simple Budgets Minus Cost ,Margin(Gross): Simple Budgets Minus Cost ͺSystem
Master Planning Hours: Availability % ,Master Planning Hours: Availability % ͺSystem
Master Planning Hours: Available Hours ,Master Planning Hours: Available Hours ͺSystem
Master Planning Hours: Billable ,Master Planning Hours: Billable ͺSystem
Master Planning Hours: Billable to Target % ,Master Planning Hours: Billable to Target % ͺSystem
Milestones Completed % ,Milestones Completed % ͺSystem
Non-Bill Default Hours ,Non-Bill Default Hours ͺSystem
_Non-Billable/Non-Productive Groups Detect PTO Only ,Non-Billable/Non-Productive Groups Detect PTO Only ͺSystem
_Non-Billable/Non-Productive Groups Detect w/o PTO ,Non-Billable/Non-Productive Groups Detect w/o PTO ͺSystem
_Non-Billable/Non-Productive Groups Detect with PTO ,Non-Billable/Non-Productive Groups Detect with PTO ͺSystem
Number of Estimates ,Number of Estimates ͺSystem
Number of Forecast Records ,Number of Forecast Records ͺSystem
Number of Projects Due ,Number of Projects Due ͺSystem
Number of Projects Marked Complete ,Number of Projects Marked Complete ͺSystem
Number of Projects Starting ,Number of Projects Starting ͺSystem
Number of Skills ,Number of Skills ͺSystem
Number of Tasks ,Number of Tasks ͺSystem
Number of Time Entries ,Number of Time Entries ͺSystem
Old metric ,Old metric ͺSystem
OOO: Holiday Time + Time Off in Hours + [PTO] (IFNULL) ,OOO: Holiday Time + Time Off in Hours + [PTO] (IFNULL) ͺSystem
OOO: Holiday Time in Hours ,OOO: Holiday Time in Hours ͺSystem
OOO: Time Off in Hours + [PTO] (IFNULL) ,OOO: Time Off in Hours + [PTO] (IFNULL) ͺSystem
OOO: Time Off in Hours + Allocated [PTO] (IFNULL) ,OOO: Time Off in Hours + Allocated [PTO] (IFNULL) ͺSystem
OOO: Time Off in Hours + Scheduled [PTO] (IFNULL) ,OOO: Time Off in Hours + Scheduled [PTO] (IFNULL) ͺSystem
OOO: Workdays Out of Office ,OOO: Workdays Out of Office ͺSystem
Opportunity base (Kevin tinkering) ,Opportunity base (Kevin tinkering) ͺSystem
Opportunity cost: Non-Bill time x Default Rate ,Opportunity cost: Non-Bill time x Default Rate ͺSystem
Option: Allocated Cost, Fees, or Hours ,Option: Allocated Cost, Fees, or Hours ͺSystem
Out of Scope Project Count ,Out of Scope Project Count ͺSystem
Over/Under Budget - % Method ,Over/Under Budget - % Method ͺSystem
Over/Under Budget - A+S Method ,Over/Under Budget - A+S Method ͺSystem
PA % Complete Check ,PA % Complete Check ͺSystem
PA Amount ,PA Amount ͺSystem
PA Amount - Forecast ,PA Amount - Forecast ͺSystem
PA Amount - Revenue Recognized ,PA Amount - Revenue Recognized ͺSystem
PA Budget ,PA Budget ͺSystem
PA Budget - Recognition ,PA Budget - Recognition ͺSystem
PA Budget Check ,PA Budget Check ͺSystem
PA Cost EAC ,PA Cost EAC ͺSystem
PA Cost EAC - Recognition ,PA Cost EAC - Recognition ͺSystem
PA EAC Override Check ,PA EAC Override Check ͺSystem
PA Export % Complete ,PA Export % Complete ͺSystem
PA Export Cost Between Global Date ,PA Export Cost Between Global Date ͺSystem
PA Export Cost EAC with PA Check ,PA Export Cost EAC with PA Check ͺSystem
PA Export EAC Actual Cost Detect ,PA Export EAC Actual Cost Detect ͺSystem
PA Export EAC Actual Hours Detect ,PA Export EAC Actual Hours Detect ͺSystem
PA Export Global Date Max+1 ,PA Export Global Date Max+1 ͺSystem
PA Export Global Date min +1 ,PA Export Global Date min +1 ͺSystem
PA Export Hours Between Global Date ,PA Export Hours Between Global Date ͺSystem
PA Export Hours EAC with PA Check ,PA Export Hours EAC with PA Check ͺSystem
PA Hours ,PA Hours ͺSystem
PA Hours - Recognition ,PA Hours - Recognition ͺSystem
PA Hours EAC ,PA Hours EAC ͺSystem
PA Hours EAC - Recognition ,PA Hours EAC - Recognition ͺSystem
PA Hours EST - Recognition ,PA Hours EST - Recognition ͺSystem
PA Hours ETC ,PA Hours ETC ͺSystem
PA Hours ETC - Recognition ,PA Hours ETC - Recognition ͺSystem
PA Hours To Date - Recognition ,PA Hours To Date - Recognition ͺSystem
PA Override Check ,PA Override Check ͺSystem
PA Percent Complete ,PA Percent Complete ͺSystem
PA Percent Complete - Recognition ,PA Percent Complete - Recognition ͺSystem
PA Revenue Rec. Check ,PA Revenue Rec. Check ͺSystem
PA Total Estimated Hours ,PA Total Estimated Hours ͺSystem
PA Total Hours to Date ,PA Total Hours to Date ͺSystem
Pace/Progress Health: Duration vs. Hours ,Pace/Progress Health: Duration vs. Hours ͺSystem
Participation Allocated Workspace Hours [Sum] ,Participation Allocated Workspace Hours [Sum] ͺSystem
Participation Estimated Workspace Hours [Sum] ,Participation Estimated Workspace Hours [Sum] ͺSystem
Personnel [count] with Schedule entries ,Personnel [count] with Schedule entries ͺSystem
Personnel [count] with Time Entries ,Personnel [count] with Time Entries ͺSystem
Planned Hours > Scheduled for Availability by Week (soft) ,Planned Hours > Scheduled for Availability by Week (soft) ͺSystem
Planned Hours: from Today ,Planned Hours: from Today ͺSystem
Planned vs. Estimated Hours Variance ,Planned vs. Estimated Hours Variance ͺSystem
Planned vs. Scheduled Hours Varianc ,Planned vs. Scheduled Hours Varianc ͺSystem
_Possible Workday Hours in a Period [sum] - Shared ,Possible Workday Hours in a Period [sum] - Shared ͺSystem
_Possible Workday Hours in a Period [sum] - Shared by all other ,Possible Workday Hours in a Period [sum] - Shared by all other ͺSystem
_Possible Workday Hours in a Period [sum] - Shared by month, all other ,Possible Workday Hours in a Period [sum] - Shared by month, all other ͺSystem
_Possible Workday Hours in a Period [sum] - Shared by week, all oth... ,Possible Workday Hours in a Period [sum] - Shared by week, all oth... ͺSystem
_Possible Workday Hours in a Period [sum] - Shared by week, all other ,Possible Workday Hours in a Period [sum] - Shared by week, all other ͺSystem
_Possible Workday Hours in a Period [sum]: by all other ,Possible Workday Hours in a Period [sum]: by all other ͺSystem
Potential Foregone Revenue of Unscheduled on Workweek Day by User ,Potential Foregone Revenue of Unscheduled on Workweek Day by User ͺSystem
Priority Level - Most Critical Issue ,Priority Level - Most Critical Issue ͺSystem
Productive(Non-Bill) Hours ,Productive(Non-Bill) Hours ͺSystem
Project % Complete by Top Level Task ,Project % Complete by Top Level Task ͺSystem
Project % Duration Burn ,Project % Duration Burn ͺSystem
Project Account Hours/Cost EAC within Global Date ,Project Account Hours/Cost EAC within Global Date ͺSystem
Project Accounting Budget within Global Date ,Project Accounting Budget within Global Date ͺSystem
Project Accounting EAC Cost within Global Date ,Project Accounting EAC Cost within Global Date ͺSystem
Project Accounting EAC Hours within Global Date ,Project Accounting EAC Hours within Global Date ͺSystem
Project Budget Used ,Project Budget Used ͺSystem
Project Budgets ,Project Budgets ͺSystem
Project Completed Date ,Project Completed Date ͺSystem
Project Due Date ,Project Due Date ͺSystem
Project Duration Days: Completed-Start (w/o Weekends) ,Project Duration Days: Completed-Start (w/o Weekends) ͺSystem
Project Duration Days: Due-Start (w/o Weekends) ,Project Duration Days: Due-Start (w/o Weekends) ͺSystem
Project Duration To Date: Today-Start ,Project Duration To Date: Today-Start ͺSystem
Project Duration To-Date: Today-Start (w/o Weekends) ,Project Duration To-Date: Today-Start (w/o Weekends) ͺSystem
Project Duration: Open vs. Completed ,Project Duration: Open vs. Completed ͺSystem
Project Duration: Saturday Completed ,Project Duration: Saturday Completed ͺSystem
Project Duration: Saturday Due ,Project Duration: Saturday Due ͺSystem
Project Duration: Sunday Start ,Project Duration: Sunday Start ͺSystem
Project Paid [sum] ,Project Paid [sum] ͺSystem
Project Risk: Execution [average] ,Project Risk: Execution [average] ͺSystem
Project Risk: Pace [average] ,Project Risk: Pace [average] ͺSystem
Project Risk: Resources [average] ,Project Risk: Resources [average] ͺSystem
Project Start Date ,Project Start Date ͺSystem
Project Status Count ,Project Status Count ͺSystem
Project Status Flag ,Project Status Flag ͺSystem
Project Target Margin ,Project Target Margin ͺSystem
Project Task Pace ,Project Task Pace ͺSystem
Projected Fees [sum] - T&M [by All Time] ,Projected Fees [sum] - T&M [by All Time] ͺSystem
Projected Fees [sum] T&M: Budgeted Not Scheduled BY Time 2 ,Projected Fees [sum] T&M: Budgeted Not Scheduled BY Time 2 ͺSystem
Projects [count] - Past Due ,Projects [count] - Past Due ͺSystem
Projects [count] - Past Due Projects ,Projects [count] - Past Due Projects ͺSystem
Projects [count] (Participation) ,Projects [count] (Participation) ͺSystem
Projects [count] (SAD) ,Projects [count] (SAD) ͺSystem
Projects [count] where Invoices Present ,Projects [count] where Invoices Present ͺSystem
Projects Count ,Projects Count ͺSystem
Projects Due in next 60 Days ,Projects Due in next 60 Days ͺSystem
Projects Due in the Next 60 Days ,Projects Due in the Next 60 Days ͺSystem
PTD Performance Variance ,PTD Performance Variance ͺSystem
PTO Delta: Actual and Scheduled ,PTO Delta: Actual and Scheduled ͺSystem
PTO Hours ,PTO Hours ͺSystem
PTO w/o Billable Filters ,PTO w/o Billable Filters ͺSystem
Q-Q change in % of Projects complete on budget ,Q-Q change in % of Projects complete on budget ͺSystem
Rate Card Usage Count ,Rate Card Usage Count ͺSystem
Realized Bill Rate ,Realized Bill Rate ͺSystem
Recognized % Complete Record ,Recognized % Complete Record ͺSystem
Recognized Revenue Amount in Accounting Period ,Recognized Revenue Amount in Accounting Period ͺSystem
Remaining Estimated hours by User with Split Check V2 ,Remaining Estimated hours by User with Split Check V2 ͺSystem
Remaining Estimated Hours via % Complete: All ,Remaining Estimated Hours via % Complete: All ͺSystem
Remaining Hours from Estimate ,Remaining Hours from Estimate ͺSystem
Resource Health: Burnout ,Resource Health: Burnout ͺSystem
Resource Health: Consolidated ,Resource Health: Consolidated ͺSystem
Resource Health: Count of Users where ETC > Estimate by Task ,Resource Health: Count of Users where ETC > Estimate by Task ͺSystem
Resource Health: Scheduled Hours past Task Due Date ,Resource Health: Scheduled Hours past Task Due Date ͺSystem
Retainer Remaining ,Retainer Remaining ͺSystem
Rev Rec > Project Budget and Complete or Archived ,Rev Rec > Project Budget and Complete or Archived ͺSystem
Revenue - Forecast Variance ,Revenue - Forecast Variance ͺSystem
Revenue [estimated] Fixed-to-Date Cost/EAC Cost % ,Revenue [estimated] Fixed-to-Date Cost/EAC Cost % ͺSystem
Revenue Distribution Base by User: Actual Cost % of EAC ,Revenue Distribution Base by User: Actual Cost % of EAC ͺSystem
Revenue Dynamic ,Revenue Dynamic ͺSystem
Revenue Dynamic w/ Global Date ,Revenue Dynamic w/ Global Date ͺSystem
Revenue Est ,Revenue Est ͺSystem
Revenue Est: % Complete ,Revenue Est: % Complete ͺSystem
Revenue Est: Accounting Period ,Revenue Est: Accounting Period ͺSystem
Revenue Est: Actual Hours/Cost ,Revenue Est: Actual Hours/Cost ͺSystem
Revenue Est: Budget Check ,Revenue Est: Budget Check ͺSystem
Revenue Est: EAC Hours/Cost Identifier ,Revenue Est: EAC Hours/Cost Identifier ͺSystem
Revenue Forecast: Monthly ,Revenue Forecast: Monthly ͺSystem
Revenue Rec. < Global Date ,Revenue Rec. < Global Date ͺSystem
Revenue Rec. Method Check ,Revenue Rec. Method Check ͺSystem
Revenue Rec. Method: % Complete ,Revenue Rec. Method: % Complete ͺSystem
Revenue Rec. Method: On Completion ,Revenue Rec. Method: On Completion ͺSystem
Revenue Rec. Method: T&M ,Revenue Rec. Method: T&M ͺSystem
Revenue-to-date [estimated] for Fix or T&M ,Revenue-to-date [estimated] for Fix or T&M ͺSystem
Schedule vs. Allocated Variance detect (+/- 1 hour range) ,Schedule vs. Allocated Variance detect (+/- 1 hour range) ͺSystem
Schedule vs. Plan Variance detect (+/- 1 hour range) ,Schedule vs. Plan Variance detect (+/- 1 hour range) ͺSystem
Schedule/Actual Check ,Schedule/Actual Check ͺSystem
Scheduled Hours (last or next 30 Days) ,Scheduled Hours (last or next 30 Days) ͺSystem
Scheduled Hours > Global Date ,Scheduled Hours > Global Date ͺSystem
Scheduled hours 2 weeks beyond Last Scheduled Date within a selecte... ,Scheduled hours 2 weeks beyond Last Scheduled Date within a selecte... ͺSystem
Scheduled PTO+Time Off+Holidays ,Scheduled PTO+Time Off+Holidays ͺSystem
Scheduled vs. Estimated Hours Variance ,Scheduled vs. Estimated Hours Variance ͺSystem
_Snapshot [First in Period] ,Snapshot [First in Period] ͺSystem
_Snapshot [Last in Period] ,Snapshot [Last in Period] ͺSystem
Soft & Hard Allocated Hours without pf role workspace title ,Soft & Hard Allocated Hours without pf role workspace title ͺSystem
Stories [count] by Workspace Group ,Stories [count] by Workspace Group ͺSystem
T&M Overcap Check ,T&M Overcap Check ͺSystem
Target Billability in Hours by [Runsum] ,Target Billability in Hours by [Runsum] ͺSystem
Target Billability in Hours by User[net of PTO] ,Target Billability in Hours by User[net of PTO] ͺSystem
Target Margin % with Empty Value ,Target Margin % with Empty Value ͺSystem
Target Utilization in Hours by Allocation [Runsum] ,Target Utilization in Hours by Allocation [Runsum] ͺSystem
Target Utilization in Hours by User by Allocation PTD[net of PTO] ,Target Utilization in Hours by User by Allocation PTD[net of PTO] ͺSystem
Target Utilization in Hours by User by Allocation[net of PTO] ,Target Utilization in Hours by User by Allocation[net of PTO] ͺSystem
Target Utilization in Hours by User: PTD ,Target Utilization in Hours by User: PTD ͺSystem
Task (Issue) Past Due Days by Task ,Task (Issue) Past Due Days by Task ͺSystem
Task % Complete: Actual / Estimated Hours Capped ,Task % Complete: Actual / Estimated Hours Capped ͺSystem
Task % Days Burn ,Task % Days Burn ͺSystem
Task Billable Flag Numeric ,Task Billable Flag Numeric ͺSystem
Task Budget Estimate [RunSum] ,Task Budget Estimate [RunSum] ͺSystem
Task Budget Estimate [Sum] - Milestone Complete ,Task Budget Estimate [Sum] - Milestone Complete ͺSystem
Task Budget Estimate [Sum] - Milestone Open ,Task Budget Estimate [Sum] - Milestone Open ͺSystem
Task Budget Estimate [Sum] by all for Totals ,Task Budget Estimate [Sum] by all for Totals ͺSystem
Task Budget Estimate [Sum] by Story ,Task Budget Estimate [Sum] by Story ͺSystem
Task Budget Estimate [Sum] by Story for Running Margins ,Task Budget Estimate [Sum] by Story for Running Margins ͺSystem
Task Budget Estimate: Billable Only ,Task Budget Estimate: Billable Only ͺSystem
Task Budget Estimate: Current Month ,Task Budget Estimate: Current Month ͺSystem
Task Budget Remaining relative to Allocated Fees (RAD) ,Task Budget Remaining relative to Allocated Fees (RAD) ͺSystem
Task Budget Used [Sum] ,Task Budget Used [Sum] ͺSystem
Task Budgeted Hours Running Summry ,Task Budgeted Hours Running Summry ͺSystem
Task Budgeted Hours with 0 ,Task Budgeted Hours with 0 ͺSystem
Task Budgets ,Task Budgets ͺSystem
Task Budgets for Completed Tasks by Task ,Task Budgets for Completed Tasks by Task ͺSystem
Task Budgets for Non-Complete ,Task Budgets for Non-Complete ͺSystem
Task Budgets for Shared Completed and Non-completed ,Task Budgets for Shared Completed and Non-completed ͺSystem
Task Coming Due Days ,Task Coming Due Days ͺSystem
Task Days Left ,Task Days Left ͺSystem
Task Due / Overdue Days ,Task Due / Overdue Days ͺSystem
Task Duration Days AVG: Due-Start (w/o Weekends) ,Task Duration Days AVG: Due-Start (w/o Weekends) ͺSystem
Task Duration Days: AVG: Completed-Start (w/o Weekends) ,Task Duration Days: AVG: Completed-Start (w/o Weekends) ͺSystem
Task Duration Days: Completed-Start ,Task Duration Days: Completed-Start ͺSystem
Task Duration Days: Completed-Start (w/o Weekends) ,Task Duration Days: Completed-Start (w/o Weekends) ͺSystem
Task Duration Days: Due-Start ,Task Duration Days: Due-Start ͺSystem
Task Duration Days: Due-Start (w/o Weekends) ,Task Duration Days: Due-Start (w/o Weekends) ͺSystem
Task Duration To Date: Today-Start ,Task Duration To Date: Today-Start ͺSystem
Task Duration To-Date: Today-Start (w/o Weekends) ,Task Duration To-Date: Today-Start (w/o Weekends) ͺSystem
Task Duration: Saturday Completed ,Task Duration: Saturday Completed ͺSystem
Task Duration: Saturday Due ,Task Duration: Saturday Due ͺSystem
Task Duration: Sunday Start ,Task Duration: Sunday Start ͺSystem
Task Duration: Variance (Est-Actual) ,Task Duration: Variance (Est-Actual) ͺSystem
Task Fixed Flag Numeric ,Task Fixed Flag Numeric ͺSystem
Task Hours Estimate [Sum] by all date performed ,Task Hours Estimate [Sum] by all date performed ͺSystem
Task Hours Estimate [Sum] by all date performed and Task ,Task Hours Estimate [Sum] by all date performed and Task ͺSystem
Task Hours Estimate [Sum] by all Shared Dates ,Task Hours Estimate [Sum] by all Shared Dates ͺSystem
Task Hours Estimate [Sum] By Task, All Other ,Task Hours Estimate [Sum] By Task, All Other ͺSystem
Task Hours Estimate [Sum] By Task, w/o User/Role ,Task Hours Estimate [Sum] By Task, w/o User/Role ͺSystem
Task Hours Estimate [Sum] by User Assignment Method ,Task Hours Estimate [Sum] by User Assignment Method ͺSystem
Task Hours Estimate [Sum] Unassigned ,Task Hours Estimate [Sum] Unassigned ͺSystem
Task Hours Estimate [Sum] with Assignment ,Task Hours Estimate [Sum] with Assignment ͺSystem
Task Hours Estimate Runsum w/o Deleted ,Task Hours Estimate Runsum w/o Deleted ͺSystem
Task Hours Estimate: Billable Tasks ,Task Hours Estimate: Billable Tasks ͺSystem
Task Pace ,Task Pace ͺSystem
Task Past Due Days - w/ validation check ,Task Past Due Days - w/ validation check ͺSystem
Task Past Due Days while Incomplete ,Task Past Due Days while Incomplete ͺSystem
Task Remaining v2 ,Task Remaining v2 ͺSystem
Task Starting Days ,Task Starting Days ͺSystem
Task Weight [Sum] - Completed ,Task Weight [Sum] - Completed ͺSystem
Tasks [count] Actual Remaining ,Tasks [count] Actual Remaining ͺSystem
Tasks [count] Ahead/behind ,Tasks [count] Ahead/behind ͺSystem
Tasks [count] by all Due Date ,Tasks [count] by all Due Date ͺSystem
Tasks [count] by all Due Date without PF ,Tasks [count] by all Due Date without PF ͺSystem
Tasks [count] Coming Due < 7 Days ,Tasks [count] Coming Due < 7 Days ͺSystem
Tasks [count] Coming Due > 30 Days ,Tasks [count] Coming Due > 30 Days ͺSystem
Tasks [count] Coming Due 15 to 30 Days ,Tasks [count] Coming Due 15 to 30 Days ͺSystem
Tasks [count] Coming Due 7 to 14 Days ,Tasks [count] Coming Due 7 to 14 Days ͺSystem
Tasks [count] Coming Due in 2 Weeks ,Tasks [count] Coming Due in 2 Weeks ͺSystem
Tasks [count] Completed ,Tasks [count] Completed ͺSystem
Tasks [count] Completed all types ,Tasks [count] Completed all types ͺSystem
Tasks [count] Empty Due Date ,Tasks [count] Empty Due Date ͺSystem
Tasks [count] future due ,Tasks [count] future due ͺSystem
Tasks [count] future due within 7 days assignment ,Tasks [count] future due within 7 days assignment ͺSystem
Tasks [count] Issues ,Tasks [count] Issues ͺSystem
Tasks [count] Open ,Tasks [count] Open ͺSystem
Tasks [count] Past Due < 7 Days ,Tasks [count] Past Due < 7 Days ͺSystem
Tasks [count] Past due > 30 Days ,Tasks [count] Past due > 30 Days ͺSystem
Tasks [count] Past due 7 to 14 Days ,Tasks [count] Past due 7 to 14 Days ͺSystem
Tasks [count] Past due and not complete ,Tasks [count] Past due and not complete ͺSystem
Tasks [count] Past due between 15 and 30 Days ,Tasks [count] Past due between 15 and 30 Days ͺSystem
Tasks [count] Past due within Project ,Tasks [count] Past due within Project ͺSystem
Tasks [count] Runsum ,Tasks [count] Runsum ͺSystem
Tasks [count] Runsum without PF ,Tasks [count] Runsum without PF ͺSystem
Tasks [count] Starting < 7 Days ,Tasks [count] Starting < 7 Days ͺSystem
Tasks [count] Starting > 30 Days ,Tasks [count] Starting > 30 Days ͺSystem
Tasks [count] Starting 15 to 30 Days ,Tasks [count] Starting 15 to 30 Days ͺSystem
Tasks [count] Starting 7 to 14 Days ,Tasks [count] Starting 7 to 14 Days ͺSystem
Tasks [count] with Scheduled ,Tasks [count] with Scheduled ͺSystem
Tasks [count]: Tasks and Deliverables ,Tasks [count]: Tasks and Deliverables ͺSystem
Tasks [count]: Type is Task ,Tasks [count]: Type is Task ͺSystem
Tasks % Complete - Estimated via % (Rolled up) ,Tasks % Complete - Estimated via % (Rolled up) ͺSystem
Tasks: Start Within 30 Days ,Tasks: Start Within 30 Days ͺSystem
Taxes: Additional Items ,Taxes: Additional Items ͺSystem
Taxes: Expenses Items ,Taxes: Expenses Items ͺSystem
Taxes: Fixed Fee Items ,Taxes: Fixed Fee Items ͺSystem
Taxes: Time Entry Items ,Taxes: Time Entry Items ͺSystem
Taxes: Total Invoice thru Rollup ,Taxes: Total Invoice thru Rollup ͺSystem
TE Bill Rate ,TE Bill Rate ͺSystem
TE Cost Rate ,TE Cost Rate ͺSystem
TE Worked Until Today ,TE Worked Until Today ͺSystem
TE Worked Until Today [ifnull 0] ,TE Worked Until Today [ifnull 0] ͺSystem
Time Logged By All ,Time Logged By All ͺSystem
Time Off Utilization PTD ,Time Off Utilization PTD ͺSystem
Top Level % Complete ,Top Level % Complete ͺSystem
Total Fees in a Period ,Total Fees in a Period ͺSystem
UnScheduled Date by Type (Rolloff or Current Gap) ,UnScheduled Date by Type (Rolloff or Current Gap) ͺSystem
_useAvailable Filter out NA Project ,useAvailable Filter out NA Project ͺSystem
User Count ,User Count ͺSystem
User Count with Unscheduled on Workweek Day by User ,User Count with Unscheduled on Workweek Day by User ͺSystem
_User Disabled Prior to Selected Period ,User Disabled Prior to Selected Period ͺSystem
User Estimated Hours / Task Estimate Hours % ,User Estimated Hours / Task Estimate Hours % ͺSystem
Users [count] on Story ,Users [count] on Story ͺSystem
Users [count] with availability ,Users [count] with availability ͺSystem
Users [count] with Scheduled ,Users [count] with Scheduled ͺSystem
Users [count] with Scheduled by Month ,Users [count] with Scheduled by Month ͺSystem
Users [count] with Time Entry ,Users [count] with Time Entry ͺSystem
Users [count] with WorkWeek Hours ,Users [count] with WorkWeek Hours ͺSystem
Users < 50% Capacity by Period ,Users < 50% Capacity by Period ͺSystem
Users > 110% Capacity by Period ,Users > 110% Capacity by Period ͺSystem
Users 50-75% of Capacity by Period ,Users 50-75% of Capacity by Period ͺSystem
Users 75 - 110% of Capacity by Period ,Users 75 - 110% of Capacity by Period ͺSystem
Users Bill Rate (from User Record) ,Users Bill Rate (from User Record) ͺSystem
Users with Rolloff on selected day ,Users with Rolloff on selected day ͺSystem
Users with Rolloff prior to selected period ,Users with Rolloff prior to selected period ͺSystem
Utilization %: Actual ,Utilization %: Actual ͺSystem
Utilization %: Actual All To Date ,Utilization %: Actual All To Date ͺSystem
Utilization %: Actual All To Date by Project ,Utilization %: Actual All To Date by Project ͺSystem
Utilization %: Actual by Week ,Utilization %: Actual by Week ͺSystem
Utilization %: Actual Utilization Project to Date [net PTO] ,Utilization %: Actual Utilization Project to Date [net PTO] ͺSystem
Utilization %: Allocated net PTO ,Utilization %: Allocated net PTO ͺSystem
Utilization %: Planned (Master Planning) ,Utilization %: Planned (Master Planning) ͺSystem
Utilization %: Planned by Project ,Utilization %: Planned by Project ͺSystem
Utilization %: Scheduled ,Utilization %: Scheduled ͺSystem
Utilization %: Scheduled [with ifnull scheduled] ,Utilization %: Scheduled [with ifnull scheduled] ͺSystem
Utilization %: Scheduled by Project ,Utilization %: Scheduled by Project ͺSystem
Utilization %: Scheduled by Week ,Utilization %: Scheduled by Week ͺSystem
Utilization %: Scheduled net of PTO ,Utilization %: Scheduled net of PTO ͺSystem
Utilization Variance: Plan to Target ,Utilization Variance: Plan to Target ͺSystem
Utilization Variance: Schedule to Target ,Utilization Variance: Schedule to Target ͺSystem
Utilization Variance: To-Date Actual to Target ,Utilization Variance: To-Date Actual to Target ͺSystem
Utilization Variance: To-Date Billable Actual to Allocated on Billa... ,Utilization Variance: To-Date Billable Actual to Allocated on Billa... ͺSystem
Utilization Variance: To-Date Billable Actual to Scheduled on Billa... ,Utilization Variance: To-Date Billable Actual to Scheduled on Billa... ͺSystem
Utilization Variance: To-Date Billable Actual to Scheduled on Billable ,Utilization Variance: To-Date Billable Actual to Scheduled on Billable ͺSystem
Utilization Variance: To-Date Billable Actual to Target ,Utilization Variance: To-Date Billable Actual to Target ͺSystem
Utilization: Hours Actual to Date: Running Summary ,Utilization: Hours Actual to Date: Running Summary ͺSystem
Variance (Actuals vs Forecast Fees) ,Variance (Actuals vs Forecast Fees) ͺSystem
Variance (Actuals vs Project Est. Rev) ,Variance (Actuals vs Project Est. Rev) ͺSystem
Variance (Actuals vs Task Est. Rev) ,Variance (Actuals vs Task Est. Rev) ͺSystem
Weight times Budget ,Weight times Budget ͺSystem
Weighted Milestone Budget ,Weighted Milestone Budget ͺSystem
Weighted Milestone Values Complete ,Weighted Milestone Values Complete ͺSystem
Weighted Milestone Values Complete TEST ,Weighted Milestone Values Complete TEST ͺSystem
Weighted Milestone Values Not Complete ,Weighted Milestone Values Not Complete ͺSystem
WIP Outstanding 1-30 [sum] ,WIP Outstanding 1-30 [sum] ͺSystem
WIP Outstanding 31-60 [sum] ,WIP Outstanding 31-60 [sum] ͺSystem
WIP Outstanding 61-90 [sum] ,WIP Outstanding 61-90 [sum] ͺSystem
WIP Outstanding 90+ [sum] ,WIP Outstanding 90+ [sum] ͺSystem
WIP Outstanding: Related Labor Cost - All ,WIP Outstanding: Related Labor Cost - All ͺSystem
_Work Days in a Period [sum] - SAD ,Work Days in a Period [sum] - SAD ͺSystem
_Work Days in a Period [sum] - Shared ,Work Days in a Period [sum] - Shared ͺSystem
_Work Days in a Period [sum] - Shared [for open] ,Work Days in a Period [sum] - Shared [for open] ͺSystem
_Work Days in a Period [sum]: by all other ,Work Days in a Period [sum]: by all other ͺSystem
_Work Days in a Period [sum]: Shared by all other ,Work Days in a Period [sum]: Shared by all other ͺSystem
Workday Billability Change ,Workday Billability Change ͺSystem
Workday Billability Prior Value ,Workday Billability Prior Value ͺSystem
Workday Time in Hours by Resource Id ,Workday Time in Hours by Resource Id ͺSystem
Workday Time in Hours by user, without pf ,Workday Time in Hours by user, without pf ͺSystem
Workday Time in Hours: Lifted for Project Breakdown ,Workday Time in Hours: Lifted for Project Breakdown ͺSystem
Workspace Completed Date ,Workspace Completed Date ͺSystem
Workspace Percentage Complete [Sum] ,Workspace Percentage Complete [Sum] ͺSystem
Workweek Hours > Actual Hours ,Workweek Hours > Actual Hours ͺSystem
Workweek Variance: Inverted (Actual - WW) ,Workweek Variance: Inverted (Actual - WW) ͺSystem
Workweek Variance: Unlogged Time by Week ,Workweek Variance: Unlogged Time by Week ͺSystem
xxDELETExx_Workday Time in Hours by user, without pf ,xxDELETExx_Workday Time in Hours by user, without pf ͺSystem

Attributes

The following table lists the renamed attributes. Supplemental attributes are at the bottom and are prefixed with a subscript character.

Old Name New Name Folder
Account Skill Description Account Skill: Description Skills
Account Skill Id Account Skill: ID Skills
Account Skill Max Level Account Skill: Max Level Skills
Account Skill Name Account Skill: Name Skills
Account Skill Type Account Skill: Type Skills
 
Additional Item Description Additional Item: Description Invoices
Additional Item Id Additional Item: Name Invoices
Taxable Additional Item: Taxable Invoices
Date (Global Date) Date (Dynamic Input) Dates
Date (Expense Date) Date (Expense) Dates
Date (Foreign Exchange Rate Effective Date) Date (Foreign Exchange Rate Effective) Dates
Date (Invoice Due Date) Date (Invoice Due) Dates
Date (Invoice Paid At) Date (Invoice Paid) Dates
Date (Invoice Date) Date (Invoice Posted) Dates
Date (PA Contract Date) Date (Project Accounting Contract Date) Dates
Date (PA Deleted at Date) Date (Project Accounting Deleted) Dates
Date (PA Period End Date) Date (Project Accounting Period End) Dates
Date (PA Period Start Date) Date (Project Accounting Period Start) Dates
Date (Workspace Status Completed At) Date (Project Completed) Dates
Date (Workspace Created At) Date (Project Created) Dates
Date (Workspace Effective Due Date) Date (Project Due) Dates
Date (Health Status Create Date) Date (Project Health Status Created) Dates
Date (Workspace Start Date) Date (Project Start) Dates
Date (WSC Updated At) Date (Project Status Updated) Dates
Date (SAD Date) Date (Resource Schedule Date) Dates
Date (Date Created) Date (Shared Created) Dates
Date (Shared Date) Date (Shared) Dates
Date (Shared Approval Date) Date (Submission Approved) Dates
Date (Shared Cancellation Date) Date (Submission Cancelled) Dates
Date (Shared Rejection Date) Date (Submission Rejected) Dates
Date (Shared Submission Date) Date (Submission Submitted) Dates
Date (Story Completed At) Date (Task Completed) Dates
Date (Story Created At) Date (Task Created) Dates
Date (Story Deleted At) Date (Task Deleted) Dates
Date (Story Due Date) Date (Task Due) Dates
Date (Story Start Date) Date (Task Start) Dates
Date (Story State Change Date) Date (Task Status Change) Dates
Date (Story Updated At) Date (Task Updated) Dates
Date (Date Performed) Date (Time Entry) Dates
Date (User Created At) Date (User Created) Dates
Date (Disabled At) Date (User Deactivated) Dates
Date (Account Skill Created At) Date (ͺAccount Skill Created) Dates
Date (Account Skill Updated At) Date (ͺAccount Skill Updated) Dates
Date (Audit Transaction Date) Date (ͺAudit Transaction) Dates
Date (ES Start Date) Date (ͺEstimate Scenario Start) Dates
Date (Expense External Reference Created At) Date (ͺExpense External Reference Created) Dates
Date (Expense External Reference Last Synced At) Date (ͺExpense External Reference Last Synced) Dates
Date (Expense External Reference Updated At) Date (ͺExpense External Reference Updated) Dates
Date (External Reference Created At) Date (ͺExternal Reference Created) Dates
Date (External Reference Last Synced At) Date (ͺExternal Reference Last Synced) Dates
Date (External Reference Updated At) Date (ͺExternal Reference Updated) Dates
Date (Invoice External Reference Created At) Date (ͺInvoice External Reference Created) Dates
Date (Invoice External Reference Last Synced At) Date (ͺInvoice External Reference Last Synced) Dates
Date (Invoice External Reference Updated At) Date (ͺInvoice External Reference Updated) Dates
Date (WSC Created At) Date (ͺProject Status Created) Dates
Date (Resource Skill Created At) Date (ͺResource Skill Created) Dates
Date (Resource Skill Updated At) Date (ͺResource Skill Updated) Dates
Date (Snapshot Date) Date (ͺSnapshot) ͺSystem
Date (Staffing Demand Created At) Date (ͺStaffing Demand Created) Dates
Date (Staffing Demand Skill Created At) Date (ͺStaffing Demand Skill Created) Dates
Date (Staffing Demand Skill Updated At) Date (ͺStaffing Demand Skill Updated) Dates
Date (Survey Answer External Reference Created At) Date (ͺSurvey Answer External Reference Created At) Dates
Date (Survey Answer External Reference Last Synced At) Date (ͺSurvey Answer External Reference Last Synced At) Dates
Date (Survey Answer External Reference Updated At) Date (ͺSurvey Answer External Reference Updated At) Dates
Date (Survey Close Date) Date (ͺSurvey Close Date) Dates
Date (Survey Created At) Date (ͺSurvey Created At) Dates
Date (Survey Due Date) Date (ͺSurvey Due Date) Dates
Date (Survey Open Date) Date (ͺSurvey Open Date) Dates
Date (Survey Question External Reference Created At) Date (ͺSurvey Question External Reference Created At) Dates
Date (Survey Question External Reference Last Synced At) Date (ͺSurvey Question External Reference Last Synced At) Dates
Date (Survey Question External Reference Updated At) Date (ͺSurvey Question External Reference Updated At) Dates
Date (Survey Response External Reference Created At) Date (ͺSurvey Response External Reference Created At) Dates
Date (Survey Response External Reference Last Synced At) Date (ͺSurvey Response External Reference Last Synced At) Dates
Date (Survey Response External Reference Updated At) Date (ͺSurvey Response External Reference Updated At) Dates
Date (Survey Template External Reference Created At) Date (ͺSurvey Template External Reference Created At) Dates
Date (Survey Template External Reference Last Synced At) Date (ͺSurvey Template External Reference Last Synced At) Dates
Date (Survey Template External Reference Updated At) Date (ͺSurvey Template External Reference Updated At) Dates
Date (Survey Updated At) Date (ͺSurvey Updated At) Dates
Date (Story Cost Budget Exchange Rate Effective Date) Date (ͺTask Cost Budget Exchange Rate Effective) Dates
Date (TE External Reference Created At) Date (ͺTE External Reference Created At) Dates
Date (TE External Reference Last Synced At) Date (ͺTE External Reference Last Synced At) Dates
Date (TE External Reference Updated At) Date (ͺTE External Reference Updated At) Dates
Date (TA Created At) Date (ͺTime Adjustment Created) Dates
Date (TA Original Date) Date (ͺTime Adjustment Original) Dates
Date (TA Posted On Date) Date (ͺTime Adjustment Posted) Dates
Date (TA Updated At) Date (ͺTime Adjustment Updated) Dates
Date (User Skill Created At) Date (ͺUser Skill Created) Dates
Date (User Skill Updated At) Date (ͺUser Skill Updated) Dates
Department Workspace ID Department: Project ID Organizations
Department Workspace L1 Department: Project L1 Organizations
Department Workspace L2 Department: Project L2 Organizations
Department Workspace L3 Department: Project L3 Organizations
Department Workspace L4 Department: Project L4 Organizations
Department Workspace L5 Department: Project L5 Organizations
Department Workspace L6 Department: Project L6 Organizations
Department Workspace L7 Department: Project L7 Organizations
Department Workspace L8 Department: Project L8 Organizations
Department User ID Department: User ID Organizations
Department User L1 Department: User L1 Organizations
Department User L2 Department: User L2 Organizations
Department User L3 Department: User L3 Organizations
Department User L4 Department: User L4 Organizations
Department User L5 Department: User L5 Organizations
Department User L6 Department: User L6 Organizations
Department User L7 Department: User L7 Organizations
Department User L8 Department: User L8 Organizations
Boolean A Dynamic Input: Boolean A Dynamic Inputs
Boolean B Dynamic Input: Boolean B Dynamic Inputs
EAC Method Dynamic Input: EAC Method Dynamic Inputs
Forecast Source Dynamic Input: Forecast Source Dynamic Inputs
Option Dynamic Input: Option Dynamic Inputs
Revenue Source Dynamic Input: Revenue Source Dynamic Inputs
Favored Estimate Scenario: Favored Estimates
Estimate Scenario Id Estimate Scenario: Name Estimates
ES Workspace Id Estimate Scenario: Project Estimates
Estimate Rate Card Estimate Scenario: Rate Card Estimates
Scenario Title Estimate Scenario: Title Estimates
Estimate Client Name Estimate: Client Name Estimates
Estimate Creator Estimate: Creator Estimates
Estimate Currency Estimate: Currency Estimates
Estimate Id Estimate: ID Estimates
Estimate Locked Estimate: Locked Estimates
Estimate Opportunity Confidence Range Estimate: Opportunity Confidence Estimates
Estimate Title Estimate: Title Estimates
Approved Expense: Approval Flag Expenses
Billable Expense: Billable Expenses
Category Expense: Category Expenses
Expense Exchange Rate Source Expense: Exchange Rate Source Expenses
Expense Id Expense: ID Expenses
Expense Last Action By Expense: Last Action By Expenses
Notes Expense: Note Expenses
Requires Approval Expense: Requires Approval Expenses
Expense Source Currency Expense: Source Currency Expenses
Status Expense: Status Expenses
Status Note Expense: Status Note Expenses
Active Submission Id Expense: Submission ID Expenses
Taxable Expense: Taxable Expenses
Expense Team Member Reimbursable Expense: Team Member Reimburseable Expenses
Expense Vendor Expense: Vendor Expenses
Fixed Fee Item Fixed Fee Item: ID Tasks
Taxable Fixed Fee Item: Taxable Tasks
Fx Account Default FX: Account Default Foreign Exchange
Fx Day Id FX: Day ID Foreign Exchange
Fx Id FX: ID Foreign Exchange
Fx Source Currency FX: Source Currency Foreign Exchange
Fx Table Name FX: Table Name Foreign Exchange
Fx Target Currency FX: Target Currency Foreign Exchange
Geography Workspace ID Geography: Project ID Organizations
Geography Workspace L1 Geography: Project L1 Organizations
Geography Workspace L2 Geography: Project L2 Organizations
Geography Workspace L3 Geography: Project L3 Organizations
Geography Workspace L4 Geography: Project L4 Organizations
Geography Workspace L5 Geography: Project L5 Organizations
Geography Workspace L6 Geography: Project L6 Organizations
Geography Workspace L7 Geography: Project L7 Organizations
Geography Workspace L8 Geography: Project L8 Organizations
Geography User ID Geography: User ID Organizations
Geography User L1 Geography: User L1 Organizations
Geography User L2 Geography: User L2 Organizations
Geography User L3 Geography: User L3 Organizations
Geography User L4 Geography: User L4 Organizations
Geography User L5 Geography: User L5 Organizations
Geography User L6 Geography: User L6 Organizations
Geography User L7 Geography: User L7 Organizations
Geography User L8 Geography: User L8 Organizations
Client Address Group: Client Address Groups
Client Contact Name Group: Client Contact Name Groups
Client Email Group: Client Email Groups
Client Phone number Group: Client Phone Number Groups
Client Website Group: Client Website Groups
Company Group: Company Groups
Workspace Group Id Group: Name Groups
Invoice Note Invoice: Note Invoices
Invoice Id Invoice: Number Invoices
Project Code Invoice: Project Code Invoices
Purchase Order Invoice: Purchase Order Invoices
Recipient Id Invoice: Recipient Invoices
Sender Id Invoice: Sender Invoices
Invoice Status Invoice: Status Invoices
Term Invoice: Term Invoices
Title Invoice: Title Invoices
PA Description Project Accounting: Description Project Accounting
Project Accounting Record Id Project Accounting: ID Project Accounting
PA Labor Type Project Accounting: Labor Type Project Accounting
PA Notes Project Accounting: Notes Project Accounting
PA Service Type Project Accounting: Service Type Project Accounting
PA Status Project Accounting: Status Project Accounting
PA Type Project Accounting: Type Project Accounting
Project Active Day Id Project Active Day: ID Projects
Currency Project Currency Projects
Currency Symbol Project Currency: Symbol Projects
Health Status Color Project Health: Color Projects
Health Status Description Project Health: Description Projects
Workspace Health Report Id Project Health: Report ID Projects
Report Type Id Project Health: Report Type ID Projects
Health Status Type Project Health: Type Projects
Account Id Project Participation: Account ID Projects
Participation Id Project Participation: ID Projects
Team Project Participation: Team Projects
Is Team Lead Project Participation: Team Lead Projects
From Status Color Project Status Change: From Color Projects
From Status Message Project Status Change: From Message Projects
Workspace Status Change Id Project Status Change: ID Projects
To Status Color Project Status Change: To Color Projects
To Status Message Project Status Change: To Message Projects
Account Id Project: Account ID Projects
Archived Project: Archived Projects
Workspace Billable Default Project: Billable Default Projects
Workspace Billing Mode Default Project: Billing Mode Default Projects
Budget Used Project: Budget Used Projects
Budgeted Project: Budgeted Projects
Primary Client Id Project: Client Lead Projects
Project Client Name Project: Client Name Projects
Workspace Color Name Project: Color Name Projects
Current Status Color Project: Current Status Color Projects
Current Status Message Project: Current Status Message Projects
Description Project: Description Projects
WS Estimate Scenario Id Project: Estimate Scenario Used Projects
Workspace ID Attribute Project: ID Projects
Include Expenses In Budget Project: Include Expenses in Budget Projects
Workspace ID Project: Name Projects
Over Budget Project: Over Budget Projects
Project: Primary Group Project: Primary Group Projects
Primary Consultant Id Project: Provider Lead Projects
Rate Card Id Project: Rate Card ID Projects
Rate Card Name Project: Rate Card Name Projects
Workspace Requires Expense Approvals Project: Requires Expense Approvals Projects
Workspace Requires Time Approvals Project: Requires Time Approvals Projects
Revenue Recognition Method Project: Revenue Recognition Method Projects
Workspace Title Attribute Project: Title Aggregate Projects
Resource Allocation Day Id Resource Allocation Day: ID Allocations
Allocation Type Resource Allocation Day: Type Allocations
Story Allocation Days Id Resource Schedule Day: ID Schedules
Resource Skill Creator Name Resource Skill: Creator Name Skills
Resource Skill Id Resource Skill: ID Skills
Resource Skill Level Resource Skill: Level Skills
Resource Skill Max Level Resource Skill: Max Level Skills
Resource Skill Name Resource Skill: Name Skills
Resource Skill Type Resource Skill: Type Skills
Resource Default Role Title Resource: Default Role Title Resource
Resource Geography Resource: Geography Resource
Resource Id Resource: Name Resource
Resource Project Title Resource: Project Title Resource
Resource Title Resource: Title Aggregate Resource
Resource Type Resource: Type Resource
Role Id Role: Name Resource
Story Active Day Id Task Active Day: ID Tasks
Current Task Assignment: Current Tasks
Assignment Id Task Assignment: ID Tasks
Assignment User Name Task Assignment: User Name Tasks
Story State Change Id Task Status Change: ID Tasks
Story State Change - Story State Task Status Change: Status Tasks
Tagging Id Task Tag: ID Tasks
Tag Name Task Tag: Name Tasks
Archived Task: Archived Tasks
Billable Task: Billable Tasks
Story Creator Name Task: Creator Tasks
Story Current State Task: Current Status Tasks
Description Task: Description Tasks
Fixed Fee Task: Fixed Fee Tasks
Story ID Attribute Task: ID Tasks
Overstarted Task: Late Start Tasks
Story Id Task: Name Tasks
Overdue Task: Overdue Tasks
Parent Story Id Task: Parent Tasks
Priority Task: Priority Tasks
Story Title Attribute Task: Title Aggregate Tasks
Top Level Story Id Task: Top Level Tasks
Story Type Task: Type Tasks
Location Archived Time Entry Location: Archived Time Entry
Location Id Time Entry Location: Name Time Entry
Location Name Time Entry Location: Name Aggregate Time Entry
Approved Time Entry: Approved Time Entry
Billable Time Entry: Billable Time Entry
Time Entry Id Time Entry: ID Time Entry
Time Entry Last Action By Time Entry: Last Action By Time Entry
Notes Time Entry: Notes Time Entry
Requires Approval Time Entry: Requires Approval Time Entry
Status Time Entry: Status Time Entry
Status Note Time Entry: Status Note Time Entry
Active Submission Id Time Entry: Submission ID Time Entry
Taxable Time Entry: Taxable Time Entry
Time Entry Type Time Entry: Type Time Entry
User Skill Creator Name User Skill: Creator Skills
User Skill Id User Skill: ID Skills
User Skill Level User Skill: Level Skills
User Skill Max Level User Skill: Max Level Skills
User Skill Name User Skill: Name Skills
User Skill Type User Skill: Type Skills
Account Id User: Account ID Users
Classification User: Classification Users
Default Role Id User: Default Role Users
User Email User: Email Users
User Full Name Attribute User: Full Name Aggregate Users
User ID Attribute User: ID Users
User Job Title User: Job Title Users
Manager Name User: Manager Users
User Id User: Name Users
Permission User: Permission Users
Action Type ͺAudit: Action Type ͺAudit
Field ͺAudit: Field ͺAudit
Audit Id ͺAudit: ID ͺAudit
Previous Value ͺAudit: Previous Value ͺAudit
Record Id ͺAudit: Record ID ͺAudit
Record Name ͺAudit: Record Name ͺAudit
Record Project ͺAudit: Record Project Name ͺAudit
Record Type ͺAudit: Record Type ͺAudit
Transaction Datetime ͺAudit: Transaction Datetime ͺAudit
Transaction Hour ͺAudit: Transaction Hour ͺAudit
Transaction Id ͺAudit: Transaction ID ͺAudit
Audit User Id ͺAudit: User ID ͺAudit
Audit User Name ͺAudit: User Name ͺAudit
Value ͺAudit: Value ͺAudit
CF Candidate Id ͺCandidate Custom Fields: ID
ͺCandidate Custom Fields
Candidate Demand Day Id ͺCandidate Demand Day: ID ͺCandidate
CDD Candidate Status ͺCandidate Demand Day: Status ͺCandidate
Candidate Id ͺCandidate: ID ͺCandidate
Candidate Status ͺCandidate: Status ͺCandidate
CF Estimate Scenario Id ͺEstimate Scenario Custom Fields: ID
Estimate Custom Fields
Expense External ID ͺExpense External: ID ͺExternal Reference
Expense Integration Service ͺExpense External: Integration Service ͺExternal Reference
Expense Integration Status ͺExpense External: Integration Status ͺExternal Reference
Expense External Link ͺExpense External: Link ͺExternal Reference
Expense External Message ͺExpense External: Message ͺExternal Reference
Expense External Object ͺExpense External: Object ͺExternal Reference
Expense External Reference Id ͺExpense External: Reference ID ͺExternal Reference
External ID ͺExternal: ID ͺExternal Reference
Integration Service ͺExternal: Integration Service ͺExternal Reference
Integration Status ͺExternal: Integration Status ͺExternal Reference
External Link ͺExternal: Link ͺExternal Reference
External Object ͺExternal: Object ͺExternal Reference
External Reference Id ͺExternal: Reference ID ͺExternal Reference
CF Workspace Group Id ͺGroup Custom Field Group Custom Fields
Invoice External ID ͺInvoice External: ID ͺExternal Reference
Invoice Integration Service ͺInvoice External: Integration Service ͺExternal Reference
Invoice Integration Status ͺInvoice External: Integration Status ͺExternal Reference
Invoice External Link ͺInvoice External: Link ͺExternal Reference
Invoice External Message ͺInvoice External: Message ͺExternal Reference
Invoice External Object ͺInvoice External: Object ͺExternal Reference
Invoice External Reference Id ͺInvoice External: Reference ID ͺExternal Reference
Pair Id ͺOrganization Pair ID Organizations
Organization Pair to Workspace Id ͺOrganization Pair to Project ID Organizations
Organization Pair to User ID ͺOrganization Pair to User ID Organizations
Department ͺOrganization: Department Organizations
Org Department Parent Name ͺOrganization: Department Parent Name Organizations
Geo ͺOrganization: Geography Organizations
Org Geography Parent Name ͺOrganization: Geography Parent Name Organizations
Planned Workday Org User Id ͺPlanned Workday: Org User ID Organizations
CF Workspace Id ͺProject Custom Field ID Project Custom Fields
Workspace to Workspace Group Id ͺProject to Group ID Groups
Records of Assignment Fact ͺRecords of Assignment Fact Tasks
Records of Candidate Custom Fields Fact ͺRecords of Candidate Custom Fields Fact
ͺCandidate Custom Fields
Records of Estimate Scenario Custom Fields Fact ͺRecords of Estimate Scenario Custom Fields Fact
Estimate Custom Fields
Records of Workspace Group Custom Fields Fact ͺRecords of Group Custom Fields Fact Group Custom Fields
Records of Invoice Workspace ͺRecords of Invoice Project Invoices
Records of Workspace Custom Fields Fact ͺRecords of Project Custom Fields Fact Project Custom Fields
Records of Workspace Fact ͺRecords of Project Fact Projects
Records of Workspace Snapshot ͺRecords of Project Snapshot ͺSystem
Records of Resource Custom Fields Fact ͺRecords of Resource Custom Fields Fact
Resource Custom Fields
Records of Staffing Demand Custom Fields Fact ͺRecords of Staffing Demand Custom Fields Fact
ͺStaffing Demand Custom Fields
Records of Story Custom Fields Fact ͺRecords of Task Custom Fields Fact Task Custom Fields
Records of Story Fact ͺRecords of Task Fact Tasks
Records of User Custom Fields Fact ͺRecords of User Custom Fields Fact User Custom Fields
Records of User Fact ͺRecords of User Fact Users
Records of User Planned Skill Workday ͺRecords of User Planned Skill Workday Users
Records of User Planned Workday ͺRecords of User Planned Workday Users
Records of User Skill Workday ͺRecords of User Skill Workday Users
Records of User Workday ͺRecords of User Workday Users
Allocation Note ͺResource Allocation Day: Note Allocations
CF Resource Id ͺResource Custom Fields: ID Resource
SAD Org User Id ͺScheduled Org: User ID Organizations
Staffing Demand Id ͺStaffing Demand ͺStaffing Demand
CF Staffing Demand Id ͺStaffing Demand Custom Fields: ID
ͺStaffing Demand Custom Fields
Staffing Demand Status ͺStaffing Demand Day: Status ͺStaffing Demand
Staffing Demand Skill Creator Name ͺStaffing Demand Skill: Creator Name ͺStaffing Demand
Staffing Demand Skill Id ͺStaffing Demand Skill: ID ͺStaffing Demand
Staffing Demand Skill Level ͺStaffing Demand Skill: Level ͺStaffing Demand
Staffing Demand Skill Max Level ͺStaffing Demand Skill: Max Level ͺStaffing Demand
Staffing Demand Skill Name ͺStaffing Demand Skill: Name ͺStaffing Demand
Staffing Demand Skill Type ͺStaffing Demand Skill: Type ͺStaffing Demand
Staffing Demand Day Id ͺStaffing Demand: Day ID ͺStaffing Demand
Staffing Demand Status ͺStaffing Demand: Status ͺStaffing Demand
Staffing Demand Title ͺStaffing Demand: Title ͺStaffing Demand
SA External ID ͺSurvey Answer: External ID ͺSurveys
SA External Link ͺSurvey Answer: External Link ͺSurveys
SA External Message ͺSurvey Answer: External Message ͺSurveys
SA External Object ͺSurvey Answer: External Object ͺSurveys
SA External Reference Id ͺSurvey Answer: External Reference ID ͺSurveys
SA External Status ͺSurvey Answer: External Status ͺSurveys
SA Integration Service ͺSurvey Answer: Integration Service ͺSurveys
SA Integration Status ͺSurvey Answer: Integration Status ͺSurveys
SA Locked ͺSurvey Answer: Locked ͺSurveys
SW Answer Id ͺSurvey Project: Answer ID ͺSurveys
SW Answer Text ͺSurvey Project: Answer Text ͺSurveys
SW Answered ͺSurvey Project: Answered ͺSurveys
SW Choice Selected ͺSurvey Project: Choice Selected ͺSurveys
SW Choice Text ͺSurvey Project: Choice Text ͺSurveys
SW Id ͺSurvey Project: ID ͺSurveys
SW Owner Id ͺSurvey Project: Owner ID ͺSurveys
SW Owner Name ͺSurvey Project: Owner Name ͺSurveys
SW Workspace ID ͺSurvey Project: Project ID ͺSurveys
SW Workspace Name ͺSurvey Project: Project Name ͺSurveys
SW Question Id ͺSurvey Project: Question ID ͺSurveys
SW Question Text ͺSurvey Project: Question Text ͺSurveys
SW Respondent Id ͺSurvey Project: Respondent ID ͺSurveys
SW Respondent Name ͺSurvey Project: Respondent Name ͺSurveys
SW Response Id ͺSurvey Project: Response ID ͺSurveys
SW Status ͺSurvey Project: Status ͺSurveys
SW Subject Name ͺSurvey Project: Subject Name ͺSurveys
SW Template Id ͺSurvey Project: Template ID ͺSurveys
SQ External ID ͺSurvey Question: External ID ͺSurveys
SQ External Link ͺSurvey Question: External Link ͺSurveys
SQ External Message ͺSurvey Question: External Message ͺSurveys
SQ External Object ͺSurvey Question: External Object ͺSurveys
SQ External Reference Id ͺSurvey Question: External Reference ID ͺSurveys
SQ External Status ͺSurvey Question: External Status ͺSurveys
SQ Integration Service ͺSurvey Question: Integration Service ͺSurveys
SQ Integration Status ͺSurvey Question: Integration Status ͺSurveys
SQ Locked ͺSurvey Question: Locked ͺSurveys
SR External ID ͺSurvey Response: External ID ͺSurveys
SR External Link ͺSurvey Response: External Link ͺSurveys
SR External Message ͺSurvey Response: External Message ͺSurveys
SR External Object ͺSurvey Response: External Object ͺSurveys
SR External Reference Id ͺSurvey Response: External Reference ID ͺSurveys
SR External Status ͺSurvey Response: External Status ͺSurveys
SR Integration Service ͺSurvey Response: Integration Service ͺSurveys
SR Integration Status ͺSurvey Response: Integration Status ͺSurveys
SR Locked ͺSurvey Response: Locked ͺSurveys
SS Answer Id ͺSurvey Task: Answer ID ͺSurveys
SS Answer Text ͺSurvey Task: Answer Text ͺSurveys
SS Answered ͺSurvey Task: Answered ͺSurveys
SS Choice Selected ͺSurvey Task: Choice Selected ͺSurveys
SS Choice Text ͺSurvey Task: Choice Text ͺSurveys
SS Id ͺSurvey Task: ID ͺSurveys
SS Owner Id ͺSurvey Task: Owner ID ͺSurveys
SS Owner Name ͺSurvey Task: Owner Name ͺSurveys
SS Question Id ͺSurvey Task: Question ID ͺSurveys
SS Question Text ͺSurvey Task: Question Text ͺSurveys
SS Respondent Id ͺSurvey Task: Respondent ID ͺSurveys
SS Respondent Name ͺSurvey Task: Respondent Name ͺSurveys
SS Response Id ͺSurvey Task: Response ID ͺSurveys
SS Status ͺSurvey Task: Status ͺSurveys
SS Subject Name ͺSurvey Task: Subject Name ͺSurveys
SS Template Id ͺSurvey Task: Template ID ͺSurveys
ST External ID ͺSurvey Template: External ID ͺSurveys
ST External Link ͺSurvey Template: External Link ͺSurveys
ST External Message ͺSurvey Template: External Message ͺSurveys
ST External Object ͺSurvey Template: External Object ͺSurveys
ST External Reference Id ͺSurvey Template: External Reference ID ͺSurveys
ST External Status ͺSurvey Template: External Status ͺSurveys
ST Integration Service ͺSurvey Template: Integration Service ͺSurveys
ST Integration Status ͺSurvey Template: Integration Status ͺSurveys
ST Locked ͺSurvey Template: Locked ͺSurveys
SU Answer Id ͺSurvey User: Answer ID ͺSurveys
SU Answer Text ͺSurvey User: Answer Text ͺSurveys
SU Answered ͺSurvey User: Answered ͺSurveys
SU Choice Selected ͺSurvey User: Choice Selected ͺSurveys
SU Choice Text ͺSurvey User: Choice Text ͺSurveys
SU Id ͺSurvey User: ID ͺSurveys
SU Owner Id ͺSurvey User: Owner ID ͺSurveys
SU Owner Name ͺSurvey User: Owner Name ͺSurveys
SU Question Id ͺSurvey User: Question ID ͺSurveys
SU Question Text ͺSurvey User: Question Text ͺSurveys
SU Respondent Id ͺSurvey User: Respondent ID ͺSurveys
SU Respondent Name ͺSurvey User: Respondent Name ͺSurveys
SU Response Id ͺSurvey User: Response ID ͺSurveys
SU Status ͺSurvey User: Status ͺSurveys
SU Subject Name ͺSurvey User: Subject Name ͺSurveys
SU Template Id ͺSurvey User: Template ID ͺSurveys
Invoice Access Id ͺSystem: Invoice Access ID ͺSystem
Login ͺSystem: Login ͺSystem
Workspace Access Id ͺSystem: Project Access ID ͺSystem
Story Access Id ͺSystem: Task Access ID ͺSystem
CF Story Id ͺTask Custom Fields: ID Task Custom Fields
Story Org Id ͺTask Org: ID Organizations
Story Cost Budget Exchange Rate Source ͺTask: Cost Budget Exchange Rate Source Tasks
Story Cost Budget Source Currency ͺTask: Cost Budget Source Currency Tasks
Task Level ͺTask: Level Tasks
Task Order Position ͺTask: Order Position Tasks
Task Order Task ID ͺTask: Order Position Task ID Tasks
TA Billable ͺTime Adjustment: Billable ͺTime Adjustments
TA Creator Name ͺTime Adjustment: Creator Name ͺTime Adjustments
Time Adjustment id ͺTime Adjustment: ID ͺTime Adjustments
TA Notes ͺTime Adjustment: Notes ͺTime Adjustments
TE External ID ͺTime Entry External: ID ͺExternal Reference
TE Integration Service ͺTime Entry External: Integration Service ͺExternal Reference
TE Integration Status ͺTime Entry External: Integration Status ͺExternal Reference
TE External Link ͺTime Entry External: Link ͺExternal Reference
TE External Message ͺTime Entry External: Message ͺExternal Reference
TE External Object ͺTime Entry External: Object ͺExternal Reference
TE External Reference Id ͺTime Entry External: Reference ID ͺExternal Reference
TE Org User Id ͺTime Entry Org: User ID Organizations
Time Entry Has External References ͺTime Entry: Has External References ͺExternal Reference
CF User Id ͺUser Custom Fields: ID User Custom Fields
User Skill SAD Id ͺUser Skill: Schedule ID Skills
Workday Org User Id ͺWorkday Org: User ID Organizations

Facts

The following table lists the renamed facts. Supplemental facts are at the bottom and are prefixed with a subscript character.

Old Name New Name Folder
AI Bill Amount In Cents Additional Item: Amount In Cents Invoices
Estimate Budget In Cents Estimate: Budget In Cents Estimates
Estimate Opportunity Confidence Estimate: Opportunity Confidence Estimates
Expense Bill Amount In Cents Expense: Amount In Cents Expenses
Expense Exchange Rate Expense: Exchange Rate Expenses
 
Expense Source Currency Amount in Cents Expense: Source Currency Amount in Cents Expenses
FFI Bill Amount In Cents Fixed Fee Item: Amount In Cents Invoices
Fx Rate FX: Rate Foreign Exchange
Holiday Time in Minutes Holiday Time In Minutes Users
Invoice Balance In Cents Invoice: Amount In Cents Invoices
Invoice Payment Schedule Invoice: Payment Schedule Invoices
Invoice Tax Rate Invoice: Tax Rate Invoices
PA Amount Project Accounting: Amount Project Accounting
PA Budget Project Accounting: Budget Project Accounting
PA Cost Project Accounting: Cost Project Accounting
PA Cost EAC Project Accounting: Cost EAC Project Accounting
PA Hours Project Accounting: Hours Project Accounting
PA Hours EAC Project Accounting: Hours EAC Project Accounting
PA Hours ETC Project Accounting: Hours ETC Project Accounting
PA Percent Complete Project Accounting: Percent Complete Project Accounting
PA Total Estimated Hours Project Accounting: Total Estimated Hours Project Accounting
PA Total Hours To Date Project Accounting: Total Hours To Date Project Accounting
Currency Base Unit Project Currency: Base Unit Projects
Workspace Amount Paid Project: Amount Paid Projects
Workspace Budget Project: Budget In Cents Projects
Workspace Budget Used In Cents Project: Budget Used In Cents Projects
Workspace Original Budget Project: Original Budget Projects
Workspace Target Margin Project: Target Margin Projects
RAD Cost Amount in Cents Resource Allocation Day: Cost In Cents Allocations
RAD Bill Amount in Cents Resource Allocation Day: Fees In Cents Allocations
RAD Time In Minutes Resource Allocation Day: Time in Minutes Allocations
SAD Bill Amount In Cents Resource Schedule Day: Bill Amount in Cents Schedules
SAD Cost Amount In Cents Resource Schedule Day: Cost Amount in Cents Schedules
SAD Time In Minutes Resource Schedule Day: Time in Minutes Schedules
Story Cost Budget Amount in Cents Task: Cost Budget Amount In Cents Tasks
Story Cost Budget Exchange Rate Task: Cost Budget Exchange Rate Tasks
Story Budget Estimate in Cents Task: Estimated Budget In Cents Tasks
Story Time Estimate in Minutes Task: Estimated Minutes Tasks
Story Percentage Complete Task: Percentage Complete Tasks
TE Bill Rate in Cents Time Entry: Bill Rate In Cents Time Entry
TE Cost Amount In Cents Time Entry: Cost In Cents Time Entry
TE Cost Rate in Cents Time Entry: Cost Rate In Cents Time Entry
TE Bill Amount In Cents Time Entry: Fees In Cents Time Entry
TE Time In Minutes Time Entry: Time In Minutes Time Entry
Time Off Time in Minutes Time Off Time In Minutes Users
User Workday Billability Target User Dynamic Utilization Target % Users
User Bill Rate in Cents User: Bill Rate in Cents Users
User Cost Rate in Cents User: Cost Rate in Cents Users
Active Billability Target User: Current Utilization Target % Users
Workday Time In Minutes Workday Time In Minutes Users
Audit Placeholder ͺAudit: Placeholder ͺAudit
dummy ͺCandidate Custom Fields: Fact Placeholder
ͺCandidate Custom Fields
dummy ͺEstimate Custom Fields: Fact Placeholder
Estimate Custom Fields
Expense External Ref Fact1 ͺExpense External: Reference Fact ͺSystem
dummy ͺGroup Custom Fields Fact Placeholder Group Custom Fields
Invoice External Ref Fact1 ͺInvoice External Ref Fact ͺSystem
Planned Minutes ͺPlanned Minutes ͺSystem
Planned Org Minutes ͺPlanned Org: Time in Minutes ͺSystem
Planned Skill Minutes ͺPlanned Skill Minutes ͺSystem
dummy ͺProject Active Day: Placeholder ͺSystem
dummy ͺProject Custom Fields Fact Placeholder Project Custom Fields
Participation Allocated Workspace Minutes ͺProject Participation: Allocated Minutes Projects
Participaion Bill Rate in Cents ͺProject Participation: Bill Rate in Cents Projects
Participation Estimated Workspace Minutes ͺProject Participation: Estimated Minutes Projects
Workspace Percentage Complete ͺProject Snapshot Percentage Complete ͺSystem
dummy ͺResource Custom Fields Fact: Placeholder
Resource Custom Fields
SAD Org Cost Amount In Cents ͺScheduled Org: Cost In Cents ͺSystem
SAD Org Bill Amount In Cents ͺScheduled Org: Fees In Cents ͺSystem
SAD Org Time In Minutes ͺScheduled Org: Time In Minutes ͺSystem
SAD Skill Cost Amount In Cents ͺScheduled Skill: Cost In Cents ͺSystem
SAD Skill Bill Amount In Cents ͺScheduled Skill: Fees In Cents ͺSystem
SAD Skill Time In Minutes ͺScheduled Skill: Time In Minutes ͺSystem
Snapshot Id ͺSnapshot ID ͺSystem
dummy ͺStaffing Demand Custom Fields Fact: Placeholder
ͺStaffing Demand Custom Fields
Staffing Demand Quantity ͺStaffing Demand Quantity ͺStaffing Demand
Sub Stories Billable Time in Minutes ͺSubtask: Billable Time In Minutes Tasks
Sub Story Count ͺSubtask: Count Tasks
Subtree Depth ͺSubtask: Depth Tasks
Sub Stories Budget Estimate in Cents ͺSubtask: Estimated Budget In Cents Tasks
Sub Stories Budget Used in Cents ͺSubtask: Estimated Budget Used In Cents Tasks
Sub Stories Time Estimate in Minutes ͺSubtask: Estimated Minutes Tasks
SW Answer Numeric ͺSurvey Project: Answer Numeric ͺSurveys
SW Dummy ͺSurvey Project: Placeholder ͺSurveys
SS Answer Numeric ͺSurvey Task: Answer Numeric ͺSurveys
SS Dummy ͺSurvey Task: Placeholder ͺSurveys
SU Answer Numeric ͺSurvey User: Answer Numeric ͺSurveys
SU Dummy ͺSurvey User: Placeholder ͺSurveys
Story Active Day Budget Estimate In Cents ͺTask Active Day: Budget Estimate in Cents Tasks
Story Active Day Time Estimate In Minutes ͺTask Active Day: Time Estimate in Minutes Tasks
Assignment Estimated Minutes ͺTask Assignment: Estimated Minutes Tasks
Assignment Allocated Minutes ͺTask Assignment: Scheduled Minutes Tasks
dummy ͺTask Custom Fields Fact: Placeholder Task Custom Fields
Story Org Budget Estimate in Cents ͺTask Org: Budget Estimate In Cents Tasks
Story Org Time Estimate in Minutes ͺTask Org: Time Estimate In Minutes Tasks
Story Logged Billable Time In Minutes ͺTask: Actual Billable Time In Minutes Tasks
Story Logged Nonbillable Time In Minutes ͺTask: Actual Non-Billable Time In Minutes Tasks
Story Cost Budget Source Amount in Cents ͺTask: Cost Budget Source Amount In Cents Tasks
Story Budget Used in Cents ͺTask: Fees In Cents Tasks
Weight ͺTask: Milestone Weight Tasks
TA Bill Rate in Cents ͺTime Adjustment: Bill Rate In Cents ͺTime Adjustments
TA Cost Amount in Cents ͺTime Adjustment: Cost Amount In Cents ͺTime Adjustments
TA Cost Rate in Cents ͺTime Adjustment: Cost Rate In Cents ͺTime Adjustments
TA Bill Amount in Cents ͺTime Adjustment: Fees In Cents ͺTime Adjustments
TA Duration in Minutes ͺTime Adjustment: Time In Minutes ͺTime Adjustments
TE External Ref Fact1 ͺTime Entry External: Reference Fact ͺExternal Reference
TE Org Bill Amount In Cents ͺTime Entry Org: Bill Amount In Cents ͺSystem
TE Org Bill Rate in Cents ͺTime Entry Org: Bill Rate in Cents ͺSystem
TE Org Cost Amount In Cents ͺTime Entry Org: Cost Amount In Cents ͺSystem
TE Org Cost Rate in Cents ͺTime Entry Org: Cost Rate in Cents ͺSystem
TE Org Time In Minutes ͺTime Entry Org: Time In Minutes ͺSystem
dummy ͺUser Custom Fields Fact Placeholder User Custom Fields
Workday Org Time In Minutes ͺWorkday Org: Time In Minutes ͺSystem
Workday Skill Time In Minutes ͺWorkday Skill: Time In Minutes ͺSystem
Workspace Org Amount Paid ͺWorkspace Org: Amount Paid ͺSystem
Workspace Org Budget ͺWorkspace Org: Budget ͺSystem
Workspace Org Original Budget ͺWorkspace Org: Original Budget ͺSystem

Renamed Legacy Dashboards

We've renamed legacy dashboards to better organize the standard dashboards list—legacy dashboards now appear at the bottom of the list. Legacy dashboards are no longer being developed, but will remain in your account and continue to be accessible.

  • The Fees (Legacy) dashboard is now [Legacy] Fees
  • The Utilization (Legacy) dashboard is now [Legacy] Utilization
  • The Recurring & Retainer dashboard is now [Legacy] Recurring & Retainer
  • The KPIs dashboard is now [Legacy] KPIs
Created on