Why can I not log time against a project when I have Collaborator permission in the account?

Mavenlink Collaborator members who wish to log time in a project must have the minimum permission level of "Time Logger" within that specific project.

Individual project permission levels can be determined within the "Team Permissions" box located to the right side in the Activity Feed section.

For more information, please visit this link:

Account and Project Permissions